Models Q4P09H, Q4P09X & Q4P09W
Installation, Operation and Maintenance
14
Rev 12/26/13
Q4P09-IOM-Q.doc
P
IVOTING
R
AMP
(Q4P09PR)
1) Raise the lift to a comfortable working height
and set into the locks.
2) Remove the M12 bolt, lock washer & washer
attaching the runway to the crossbeam, and
retain the lock washer & washer for installation
of the pivot ramp base.
3) Install the pivoting ramp base with two M12 x
40mm Lg. and two M12x35mm Flange head
bolts, washers and nuts provided in the kit, and
the lock washer and washer from the previous
step,
Fig 31
. Note the location of flange head
bolt in Fig 31. Repeat for other runway.
Fig 31
– Base Installation
4) Turn the ramp over and install the ramp
rotation stop as shown in
Fig 32
. Use the
provided M12 x 30mm Lg. bolt and M12 nut.
5) Place the stop on the gusset as shown in
Fig
32
, assembly the nut onto the bolt prior to
installing the bolt into the stop. Torque the bolt
against the ramp gusset and lock into place
with the nut.
Fig 32 – Rotational Stop
6) Assemble the ramp to the base with the ramp
hinge pin. Use the provided cotter pins to
secure the pin in place,
Fig 33
.
Fig 33 – Ramp Installation