3
3-90-7003999
Quadra-Fire • Hudson Bay Installation Manual_R26 • 01/20
Installation Standard Work Checklist
ATTENTION INSTALLER:
Follow this Standard Work Checklist
This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in
this installation manual.
Customer:
Lot/Address:
Date Installed:
Location of Stove:
Installer:
Dealer/Distributor Phone #
Serial #:
WARNING! Risk of Fire or Explosion!
Failure to install appliance according to these instructions can lead to a
fire or explosion.
!
Appliance Install - Section 3
YES
If NO, WHY?
Verified combustible or non-combustible clearances to walls. (Pg. 7)
Stove is installed level
Venting/Chimney - Section 5 (Pg 10-21)
Venting configuration complies with allowable vent requirements.
Venting installed, locked and secured in place with proper clearance.
Interior/Exterior firestops installed and sealed.
Attic insulation shield installed.
Exterior wall/Roof flashing installed and sealed.
Terminations/Roof flashing installed and sealed.
Electrical - Section 7 (Pg 26-27)
Unswitched power (110-120 VAC) provided for the appliance.
Switch wires properly installed.
Gas - Section 6 (Pg 22-26)
Appliance configuration matches fuel type.
Was a conversion performed?
Leak check performed and inlet/outlet pressure verified.
Set air shutter for optimal flame appearance.
Appliance Setup - Section 8 (Pg 28-35)
All packaging and protective materials are from removed inside/
under/on the appliance).
Refractories, logs, and mineral wool installed correctly.
Glass assembly installed and secured.
Accessories installed properly.
Door properly installed. Firescreen properly installed (if equipped).
Manual bag and all of its contents are removed from inside/under
the appliance and given to party responsible for use and operation.
Started appliance and verified no gas leaks exist.
Hearth & Home Technologies recommends the following:
• Photographing the installation and copying this checklist for your file.
• That this checklist remain visible at all times on the appliance until the installation is complete.
Comments: Further description of the issues, who is responsible (Installer/ Builder/ Other Trades, etc) and corrective action
needed: __________________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
Comments Communicated to party responsible _______________________
by
________________
on
_____________
(Builder / Gen. Contractor/)
(Installer)
(Date)
Hudbay-FS 07/17
= Contains updated information