9
3-90-7003999
Quadra-Fire • Hudson Bay Installation Manual_R26 • 01/20
A. Vent Termination Minimum Clearances
Figure 4.1
- Termination Clearances
Measure vertical clearances from this surface.
Measure horizontal clearances from this surface.
(See
Figure 4.4
for specific clearances.)
Figure 4.3
- Specifies minimum vent heights for various pitched
roofs.
Minimum Height from Roof to Lowest Discharge Opening
HORIZONTAL
OVERHANG
VERTICAL
WALL
GAS DIRECT VENT
TERMINATION CAP
12
X
ROOF PITCH
IS X/ 12
LOWEST
DISCHARGE
OPENING
2 FT.
MIN.
20 INCHES MIN.
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
Roof Pitch
H (Min.) Ft.
Flat to 6/12 ......................................................... 1.0*
Over 6/12 to 7/12
........................................................ 1.25*
Over 7/12 to 8/12 ............................................... 1.5*
Over 8/12 to 9/12 ............................................... 2.0*
Over 9/12 to 10/12 ............................................. 2.5*
Over 10/12 to 11/12 ........................................... 3.25
Over 11/12 to 12/12 ........................................... 4.0
Over 12/12 to 14/12 ........................................... 5.0
Over 14/12 to 16/12 ........................................... 6.0
Over 16/12 to 18/12 ........................................... 7.0
Over 18/12 to 20/12 ........................................... 7.5
Over 20/12 to 21/12 ........................................... 8.0
* 3 foot minimum in snow regions
Figure 4.2
- Multiple Vertical Termination
Gas, Wood or Fuel Oil
Termination Cap
B
Gas
Termination
Cap **
A *
*
If using decorative cap cover(s), this distance may need to be
increased. Refer to the installation instructions supplied with the
decorative cap cover.
**
A
B
6 in. (minimum) up to 20 in.
152 mm/508 mm
18 in. minimum
457 mm
20 in. and over
0 in. minimum
In a staggered installation with both gas and wood or fuel oil
terminations, the wood or fuel oil termination cap must be
higher than the gas termination cap.
4
4
Termination Location and Vent Information
Fire Risk.
Explosion Risk.
Maintain vent clearance to combustibles as
specified.
• Do not pack air space with insulation or other
materials.
Failure to keep insulation or other materials
away from vent pipe may cause fire.
WARNING
!