Quadra-Fire • Hudson Bay Installation Manual_R26 • 01/20
Step 9 -
Twist-lock the vent cap and seal.
Note:
For multi-story vertical installations, a ceiling
firestop
is required at the second floor, and any subsequent floors
(Figure
5.16). The opening should be framed to 10 in. x
10 in. (254mm x 254mm) inside dimensions, in the same
manner as shown in Fig
ure 5.13.
MIN. 1 in. (25mm)
CLEARANCE
CEILING FIRESTOP
NAILS
MIN. 1 in. (25mm)
CLEARANCE
MIN. 1 in. (25mm)
CLEARANCE
MIN. 1 in. (25mm)
CLEARANCE
Figure 5.16
Fire Risk, Explosion Risk
•
Any occupied areas above the first floor, including
closets and storage spaces, which the vertical
vent passed through must be enclosed. The
enclosure may be framed and sheet rocked with
standard construction materials; however, refer
to these installation instructions for the minimum
allowable clearance between the outside of the
vent pipe and the combustible surfaces of the
enclosure. Do not fill any of the required air space
with insulation.