Steps to Run Permit Mail
From the Print Mode: [Permit mail] home screen:
1.
Start a new Operational Permit Report
if necessary.
Press
Reset/Report
to open the Operational Permit Report screen and start a new
report.
2.
Select the sealing mode
that corresponds to your mail stack: see
on page 49.
3.
Depending on the weighing mode selected,
run mail
according to one of the sections
below:
Steps to Run Mail in Dynamic Weighing Modes
on page 53
Running Mail in Standard Weighing Mode
on page 54
Running Mail in Manual Weighing Mode
on page 58
When the sealer is activated, collect the mail piece stack in the
catch tray and put the stack aside to let the envelopes dry.
3
Processing
67
| Page 67 | Oct-05-2016 10:44 |
Содержание IS-5000
Страница 1: ...User Guide IS 5000 Mailing Systems with iMeterTM Postage Meter User Guide ...
Страница 5: ... Page 4 TOC Oct 05 2016 10 44 ...
Страница 7: ......
Страница 13: ......
Страница 15: ......
Страница 35: ......
Страница 106: ...5 Adjust the high stack guide 3 Processing Mail 101 Page 101 Oct 05 2016 10 44 ...
Страница 117: ......
Страница 123: ...4 e ...
Страница 205: ......
Страница 219: ......
Страница 223: ......
Страница 250: ...Geodesic map 8 Configuring the System 245 Page 245 Oct 05 2016 10 44 ...
Страница 251: ...Geodesic codes 246 Page 246 Oct 05 2016 10 44 8 Configuring the System ...
Страница 279: ......
Страница 281: ......
Страница 301: ......
Страница 321: ......
Страница 335: ......
Страница 337: ......
Страница 339: ...System Connections 12 2 Base Feeder CAN Power 334 Page 334 Oct 05 2016 10 44 12 System Specifications ...
Страница 340: ...Base Feeder Dynamic Weighing Module CAN Power 12 System Specifications 335 Page 335 Oct 05 2016 10 44 ...
Страница 341: ...Base Stacker Power 336 Page 336 Oct 05 2016 10 44 12 System Specifications ...
Страница 363: ...4146016R h 07 11 2019 ...
Страница 364: ...4146016R h 07 11 2019 ...