30
.
.
.
.
.
.
.
. .
.
.
.
.
.
.
.
. .
.
.
. .
.
.. .
.
.
.
.
.
.. .
.
. .
.
.
.
.
.
.
.
.. .
.
.
. .
.
.
.
.
.
. .
.
. . .
.
.
.
.
.
.
. .
.
.
.
.
.
.
. .
.
.
.. ..
.
.
.
. .
.
.
.
.
.
. .
.
.
.
.
. .
.
..
.
. .
.
.
.
.
.
. .
.
.
.
.
.
. .
.
.
.
.
.
.
.
.
.
.
. ..
.
.
.
.
.
.
.
......
..
.
.
.
.. .
43
Do not block water flow by a rise.
Do not put the end of drain hose
into water.
Figure 12
9.2 Drain joint installation
Fit the seal into the drain elbow, then insert the drain joint into the base pan hole in the bottom of the
outdoor unit, rotate 90° to assemble them securely. Connect the drain joint with an extension drain hose
(not included). In this way condensed water, which is produced during heating mode of the air conditioner,
can be drained away. See fig. 13.
A
B
Figure 13
Seal
Drain joint
Base pan hole of
outdoor unit
Seal
Drain pipe
10. ELECTRICAL WORK
•
Connect the air conditioner to a separate group. Ensure that this group has the correct fuse
•
See following table.
•
Power voltage supplied should be in the range of 95%~105% of rated voltage on rating table.
•
The power supply must have an earth leak switch installed.
•
Ensure the air conditioner is grounded well.
•
Connect the wires according the attached electrical connection diagram located on the panel of the
outdoor unit. See chapter 11
•
All wiring must comply with local and national electrical standards and codes and be installed by
qualified and skilled people.
Model
Power supply
Input Rated Current
(Switch/Fuse)
Power cord size
≤
3,5 kW
230V~50Hz
16A
2,5 mm
2
>
3,5 kW
230V~50Hz
16A slow
2,5 mm
2
G
NOTE!
The supply voltage should be consistent with the rated voltage of the air conditioner.
11. CONNECTING THE ELECTRICAL CABLES.
a.
Connect the cable to the indoor unit
4
30
Instal_S70xx ('21) V1.indd 30
Instal_S70xx ('21) V1.indd 30
08-11-2021 18:12
08-11-2021 18:12
Содержание S 7026
Страница 17: ...6 17 Instal_S70xx 21 V1 indd 17 Instal_S70xx 21 V1 indd 17 08 11 2021 18 12 08 11 2021 18 12 ...
Страница 49: ...u 49 Instal_S70xx 21 V1 indd 49 Instal_S70xx 21 V1 indd 49 08 11 2021 18 12 08 11 2021 18 12 ...
Страница 65: ... 65 Instal_S70xx 21 V1 indd 65 Instal_S70xx 21 V1 indd 65 08 11 2021 18 12 08 11 2021 18 12 ...
Страница 66: ...66 Instal_S70xx 21 V1 indd 66 Instal_S70xx 21 V1 indd 66 08 11 2021 18 12 08 11 2021 18 12 ...
Страница 67: ...67 Instal_S70xx 21 V1 indd 67 Instal_S70xx 21 V1 indd 67 08 11 2021 18 12 08 11 2021 18 12 ...