33
4
33
15. TEST RUNNING AFTER INSTALLATION
Perform test running after completing electrical safety check and gas leak check.
The test running time should last more than 30 minutes.
Check if all the functions works well during test running. Especially check whether the drainage of indoor
unit is smooth or not.
Instal_S70xx ('21) V1.indd 33
Instal_S70xx ('21) V1.indd 33
08-11-2021 18:12
08-11-2021 18:12
Содержание S 7026
Страница 17: ...6 17 Instal_S70xx 21 V1 indd 17 Instal_S70xx 21 V1 indd 17 08 11 2021 18 12 08 11 2021 18 12 ...
Страница 49: ...u 49 Instal_S70xx 21 V1 indd 49 Instal_S70xx 21 V1 indd 49 08 11 2021 18 12 08 11 2021 18 12 ...
Страница 65: ... 65 Instal_S70xx 21 V1 indd 65 Instal_S70xx 21 V1 indd 65 08 11 2021 18 12 08 11 2021 18 12 ...
Страница 66: ...66 Instal_S70xx 21 V1 indd 66 Instal_S70xx 21 V1 indd 66 08 11 2021 18 12 08 11 2021 18 12 ...
Страница 67: ...67 Instal_S70xx 21 V1 indd 67 Instal_S70xx 21 V1 indd 67 08 11 2021 18 12 08 11 2021 18 12 ...