ePAQ-9400 UG-1083
O-
9100 User’s Guide UG-1062
30
Test Panel Copyright © 2016
QEI.
NOTE
The display will indicate in decimal format and display the actual count, as
sampled (15-bit values).
When additional accumulator points are to be examined, press the
ENTER
key, the accumulator points previously entered will scroll upwards to the next
line on the display and all values will be frozen. Then repeat step 1. by
entering
RC
and the desired accumulator point numbers. This procedure can
be continued to examine every accumulator point in the subsystem, if
desired.
NOTE
Over a Remote based test panel connection, this command will continue to
update the screen after the 5 minute inactivity timeout has elapsed. When
you attempt to exit from this command (by pressing Enter), you will be
prompted to re-enter a valid username and password combination.
14.11
Relay Control
CAUTION !!!
THE FOLLOWING PROCEDURE WILL ENERGIZE RELAYS CONNECTED
TO CONTROL POINTS. MAKE CERTAIN THAT EITHER IT IS SAFE TO
COMMAND THE POINT OR THAT THE FIELD DEVICE IS
DISCONNECTED FROM THE RELAY.
NOTE
When connected to the test panel via a Remote connection, Relay Control
commands are not available for security reasons.
Two (2) relay commands can be entered by the Test Panel to operate control relays.
Command CN will control a function 1 (ON) relay and CF will command a function 2
(OFF) relay.
14.11.1
On Relay Operation (CN)
To operate the function 2 (ON) relay on a control point (odd numbered
relays K1-K15 typically), type
CN
(space) and the point number of the
relay. Point numbers start with 0 (zero).
Press the
ENTER
key. The relay will operate (*). All function 2 (ON)
relays may be controlled one at a time by repeating this sequence and
using different point numbers.
Example
Содержание ePAQ-9400
Страница 1: ...UG 1083 ePAQ 9400 User s Guide December 2018 ...
Страница 4: ......