![QED CRT410 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/qed/crt410/crt410_user-manual_3131113003.webp)
Remove all packaging and check that there has been no transport damage.
Any transport damage, must be reported to the transport company and noted on the delivery note.
To ensure correct function it is important that the cabinet is level.
For cabinets fitted with lockable wheels, ensure that the wheels are locked and are tucked
underneath the footprint of the appliance
In the case of installing the cabinet into fixed room fittings:
150 mm of free space must be left behind and above the cabinet in order for the cooling
system to operate satisfactorily.
There must be sufficient space at the hinge side to allow proper cleaning and removal /
replacement of the shelves
Place the cabinet in a dry and ventilated place.
Keep the cabinet away from heat sources and do not expose it to direct sunlight.
Using the cabinet in an ambient temperature that reaches extremes of cold (for example in goods
bay where the temperature is largely affected by the outside) may affect the internal temperature
regulation.
Important:
Before it can be turned on for the first
time, the transport safety strap must be removed from
the compressor. Access the compressor compartment
from behind the unit. The strap is held on by two cross
headed screws at either end (see fig. 1)
Remove these carefully as there will be some spring in
the strap. The strap should be saved for future use (if
the cabinet is to be moved to another site) or recycled
responsibly.
fig. 1
Start up
Before use, it is recommended that the cabinet is cleaned; see the section on maintenance and
cleaning.
Important:
If the cabinet has been placed horizontally, tilted or shaken during transport, please wait
2 hours once the cabinet is level before starting it for the first time.
When ready, connect the plug to a suitable, accessible socket and turn the cabinet on, using the
power switch in the control panel
Unpacking and Installation
MCRTL21.1 3