4
OPERATION AND MAINTENANCE MANUAL
QTS SERIES
Twin Screw Positive Displacement Pump
QTS-M
08
QTS-M
08
General Information
Every QTS pump is completely assembled, lubricated, synchronized, factory tested and ready
to use. Standard maintenance practices are described in this manual. For more information,
please see the Maintenance section. Following these guidelines will grant a longer pump
service life under a proper usage and installation.
If necessary to return the equipment under warranty, or for some other reason, contact
Q-Pumps to receive a Return Material Authorization (RMA).
Damage or loss during shipment
If you receive the equipment in poor condition or it is lost during transportation, file a claim
with the carrier immediately. The transport service provider is responsible for collecting the
goods, Q-Pumps ensure they received them in perfect conditions.
Receiving the pump
The pump inlet and outlet ports are covered prior to shipment to ensure that no foreign materials
enter inside the pump during shipping. If the protective covers are missing at delivery, remove the
pump cover and inspect the interior to ensure that it is free of contaminants before energizing
the pump. Please keep nearby the pump serial number; this will allow you to order replacement
parts and / or make warranty claims. For more information related to shipping damage and
warranty claims please see the General Information or Warranty section in this manual.
AB
O
U
T
T
H
IS
MAN
U
AL