![Q-Pumps QTS-M08 Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/q-pumps/qts-m08/qts-m08_operation-and-maintenance-manual_3081404038.webp)
38
OPERATION AND MAINTENANCE MANUAL
QTS SERIES
Twin Screw Positive Displacement Pump
QTS-M
08
QTS-M
08
MAI
N
T
E
N
AN
C
E
5.
To loosen the tapered driven ring
(20)
it is necessary to use three of the socket head cap
screw
(46)
to push it out as illustrated. The first tapered driven ring has three threads for this
purpose.
6.
Pull out the tapered driven ring
(20).
On the inside there will be the tapered drive ring
(18).
By doing this the driven gear
(42)
will loosen and move freely over the synchronization ring
(19)
20
46
20
19
18
7.
On the pump side place both rotary holder subassemblies
(12A-F)
on the shafts. In this step it
is not necessary to assemble the complete seals, it is just a preliminary assembly to set position.
It is recommended to remove the O-rings
(12A and 12D)
in the subassembly.
8.
Take the new rotors with each hand respectively [left hand-left rotor
(2)
/ right hand-right
rotor
(3)]
and mesh them together. The front faces of both rotors must be at the same level.
3
2
12A-F
9.
With the rotors meshed, place them in the shafts. Turn the shafts until the splines coincide.
There are no marks in the rotors yet.
10.
Push the rotors on the shaft until they reach each rotary holder subassembly. Place the rotor
nuts
(11)
and thigh them simultaneously until each rotary holder is pressed. You may have to
turn the rotors to create space for tightening, avoid contact between rotors. View torque table.