![Q-Pumps QTS-M08 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/q-pumps/qts-m08/qts-m08_operation-and-maintenance-manual_3081404033.webp)
33
OPERATION AND MAINTENANCE MANUAL
QTS SERIES
Twin Screw Positive Displacement Pump
QTS-M
08
15.
Take the back cover (with the seal housing inside) and carefully slide thru the studs and shafts
pushing it to the back until making contact with the secondary rotating face
(12Q) ;
use the dowel
pins to center the part with the bearing housing.
WARNING! All four dowel pins must always be placed before running the pump. Not doing so will
cause severe damage to the pump.
16.
Fix the back cover to the bearing housing with the hexagonal socket head cap screws
(28)
and tighten them firmly, the secondary seal springs will compress as you tight.
17.
Place the O-ring
(12D)
on the inside groove of the stainless steel rotary holder
(12B).
Insert
the coil springs
(12C)
on the inside bores of the holder.
18.
Lubricate the inside diameter of the O-ring
(12E)
and place it on the inside groove of the
holder and make sure it is fixed.
12E
12F
12D
12B
12A
12C
25
28
MAI
N
T
E
N
AN
C
E