7
Assembly and installation manual
QIM/QDB Mixer Series
QIM/QDB-M01
ASSEMBLY PRELIMINARIES
Before beginning the assembly procedure identify every element that is going to be installed,
you can use the exploded view and part list shown in pages 8 and 9. During the assembly you
may need the following tools:
1. 1”, 3/4”, 9/16” and 1/2” Wrenches.
2. 3/16” and 1/4” Allen wrenches.
3. Rubber mallet.
4. Caliper or shims.
5. 5/8” & 7/8” Socket – for impeller nut.
6. 3/8” diameter steel rod – to hold stub shaft plus.
7. Torque Wrench
WARNING
Before servicing pump, disconnect electrical
power source, carefully relieve all pressure and
drain all fluids from pump and connected piping.
IN
ST
ALL
ATIO
N