DeltaTherm IR Cure Module
Revision C
/
September 2022
Page 11 of 41
Installation and Setup
269B268B268B
WARNING: The following procedures should be done by qualified persons in
accordance with this manual and applicable safety regulations. A “qualified person”
is defined as “a person or persons who, by possession of a recog
nized degree or
certificate or professional training, or who, by extensive knowledge, training, and
experience, has successfully demonstrated the ability to solve problems relating to
the subject matter and work.” (ref. ANSI/ASME B30.2
-1983.)
Installation
1.
24B23B23B
Plug the machine into an appropriate power source as shown on the legend plate on
the module. The electrical service should be correctly grounded and the power
source “clean”. If high power equipment operates off the same source, a line
conditioner may be necessary. Poor quality power can cause errors in machine
operation.
270B269B269B
WARNING: Failure to obey electrical specifications can cause damage to the machine
or injury to installation personnel. Electrical hookup must be done by a qualified
electrician and must obey any applicable local standards.
2.
25B24B24B
Close any access doors and engage the EMERGENCY STOP button.
3.
26B25B25B
Turn the main power switch to “
On
”.
190B189B189B
2B2B2B
Figure 3: Power Switch "On"