Startingup
46
AP13_103_1501EN
Depending on the machine’s equipment, the following sequence of
actions must be carried out for the test run:
−
Open the ventilation flap (as soon as the machine is warm)
−
Open the side flaps (as soon as the machine is warm)
−
Switching on the machine
You must now check several functions with the machine running.
Caution
The ventilation flap must be open before you switch on the machine.
All operating elements on the control cabinet, in particular the main
switch and the EMERGENCY STOP button, must be quickly access
ible at all times during operation.
The side flap in front of the control cabinet must not be closed once
the engine has been switched on if this obscures the operating el
ements.
Caution
Damage to the engine caused by potential malfunctions in the fuel
and exhaust after treatment system.
Bleeding the fuel system is also urgently required. Start the five−min
ute test run while idling up to an operating temperature of approx. 90
°
C.
Check the leak tightness of the engine, the lubricating fluid pressure
and the lubricating fluid level.
Check the exhaust after treatment system for leak tightness.
The SCR system requires a warming up and thawing phase of ap
prox. 30 minutes at ambient temperatures of below 0
°
C. The heated
SCR components (e.g. DEF containers, DEF lines and DEF delivery
pump) are thawed.
Observe the requirements and recommendations in the engine
manufacturer’s documentation.
4.2
Test run
Содержание BSA 1409 D4
Страница 4: ...BP00_030_0911EN...
Страница 14: ...Guide to the Operating Instructions 1 X BP01_001_0802EN...
Страница 20: ...Guide to the Operating Instructions 1 6 AusgleichsseiteEN...
Страница 22: ...Safety regulations 2 II BP03_081_1701EN...
Страница 74: ...Safety regulations 2 52 AusgleichsseiteEN...
Страница 76: ...General technical description 3 II BP02_001_0302EN...
Страница 196: ...Starting up 4 II AP13_015_0303EN...
Страница 224: ...Starting up 4 28 AusgleichsseiteEN...
Страница 226: ...Transport setting up and connection 5 II AP06_001_1007EN...
Страница 258: ...Pumping operations 6 II AP07_026_9710EN...
Страница 312: ...Glossary 7 II BP14_001_0501EN...
Страница 334: ...Glossary G 22 BP14_002_0501EN...
Страница 336: ...Index of key words 8 II...
Страница 342: ......
Страница 346: ...BP00_030_0911EN...
Страница 352: ...Guide to the Service Instructions 1 II BP01_009_1011EN...
Страница 358: ......
Страница 360: ...Safety regulations 2 II BP03_083_1701EN...
Страница 374: ...Safety equipment 3 II BP15_001_1202EN...
Страница 392: ...Special modes of operation 4 II AP16_001_1609EN...
Страница 400: ...Special modes of operation 4 8 AusgleichsseiteEN...
Страница 402: ...Maintenance 5 II BP09_001_9405EN...
Страница 426: ...Maintenance 5 24 BP09_013_1205EN...
Страница 430: ...Maintenance card 03 002 Page 2 of 2 5 28 WK03_002_1109EN...
Страница 438: ...Maintenance card 03 026 Page 8 of 8 5 36 WK03_026_1604EN...
Страница 460: ...Maintenance card 04 013 Seite 6 von 6 5 58 WK04_013_1109EN...
Страница 474: ...Maintenance card 06 022 Page 10 of 10 5 72 WK06_022_1109EN...
Страница 480: ...Maintenance card 07 069 Page 6 of 6 5 78 WK07_069_1109EN...
Страница 496: ...Maintenance card 07 070 Page 16 of 16 5 94 WK07_070_1109EN...
Страница 510: ...Maintenance card 07 071 Page 14 of 14 5 108 WK07_071_1109EN...
Страница 518: ...Maintenance card 07 072 Page 8 of 8 5 116 WK07_072_1109EN...
Страница 532: ...Maintenance card 07 074 Page 6 of 6 5 130 WK07_074_1109EN...
Страница 546: ...Maintenance card 07 075 Page 14 of 14 5 144 WK07_075_1109EN...
Страница 558: ...Index of key words 6 II...