background image

12

 

Installation & Operation Manual

Copyright © Puretec Pty Ltd 2018

Replacement Parts Guide

Replacement Parts Guide

To maintain a high quality of purified water, the cartridges will need changing 

periodically (this is dependant on water quality and usage).

You can obtain replacement cartridges from your local Puretec dealer. To maintain 
performance, warranty and Australian Standards use genuine Puretec replacements.

Replacement Parts:

HYBRID R10

HYBRID R11

Stage 1 Cartridge

PL05MP1

PL05MP2

Stage 2 Cartridge

CB05MP1

CB05MP2

Stage 3 Cartridge

PX01MP1

PX01MP2

Stage 4 UV Lamp

RL6

RL6

Quartz Sleeve

RQS6

RQS6

Replace cartridges every 6 months. We recommend replacing UV lamp annually

Содержание HYBRID R10

Страница 1: ...llation it is essential to observe these instructions Triple Filtration Ultraviolet All in One Unit with Reversible Bracket Hybrid R Triple User Guide JUL2018 WMTS103 2016 Certificate No WM 74593 Australian Certification Services ...

Страница 2: ...paring your system 4 Positioning your System 5 Power Surge Protection 5 Installation Requirements 6 Initial Installation Procedure 8 Operation 10 Radfire UV Unit 11 Lamp Ballast Operation 11 Lamp Ballast Specifications 11 Replacement Parts Guide 12 Cartridge Replacement Procedure 13 Lamp Replacement Procedure 14 Quartz Sleeve Maintenance Replacement Procedure 15 Troubleshooting Guide 17 Warranty 1...

Страница 3: ...ight This system will effectively treat water depending on the required UV dosage and existing water quality The system is designed for mains and rainwater supply but can be used in other situations For other types of water supply please contact your local Puretec stockist or call our Puretec Customer Service Helpline at 1300 140 140 Australia or 0800 130 140 New Zealand The Puretec Hybrid R Tripl...

Страница 4: ...uld have Remove all the packing materials prior to use As a responsible manufacturer we care about the environment We urge you to follow the correct disposal procedure for your product and packaging materials You must dispose of this product and its packaging according to local laws and regulations For correct operat ion installa tion it is essent ial to observ e these instruc tions JAN2017 Triple...

Страница 5: ...ate ventilation Choose a location with adequate drainage and where water spillage will not cause damage that may occur over time from leaking pipe joints or seals Power Surge Protection An electrical power surge or spike can travel on the supply lines and cause serious damage to your electrical equipment The Radfire UV Electronic ballast has a fuse not replaceable to protect the circuit The fuse i...

Страница 6: ...system Ensure the electrical power supply to the Hybrid system is sufficient allowing for other appliances that may be connected to the circuit eg pump and ensuring it is surge protected and protected against brown outs If in doubt please consult a qualified electrician Use unions at pipe connections to enable easy removal and servicing Use sufficient tape to ensure airtight seal and do not over t...

Страница 7: ...en present prior to the installation of this system we recommend flushing the pipelines with Puretec TankSafe Never connect PVC pipe directly to the unit The outlet pipework within 1 metre should be metal or polyethylene The system should not be used for any other purpose without specific referral to Puretec Heating of water is an integral feature associated with UV systems and if this is deemed a...

Страница 8: ...iple system remembering to allow 120mm under the unit R11 model and 700mm clearance above the unit for cartridge and lamp changes A power outlet is required allow min 120mm clearance from the ground HYBRID R10 MODEL HYBRID R11 MODEL Installation Procedure 3 The Hybrid R Triple unit has 4 mounting provisions 2 key holes at the front and rear of the bracket Use the template provided to mark the desi...

Страница 9: ... fig 9 1 10 Slowly insert UV lamp into chamber through the hole of the aluminium nut end Connect the lamp connector to the pins on the lamp Do not let go of the lamp until the lamp is connected to the socket see fig 9 2 Never touch the quartz glass and lamp surface as marks or fingerprints may interfere with UV transmission If lamp is soiled please clean lamp with an alcohol based cleaner 12 Put s...

Страница 10: ...itable sanitiser such as TankSafe for dosage refer to TankSafe product instructions This solution should be left in the pipework for at least an hour and preferably overnight The sanitising solution can be added into the water tank or if necessary added as a shock dose into the bowl of the filter housing of the Hybrid R Triple and slowly flushed through the piping If added as a shock dose the syst...

Страница 11: ...seem warm for a short period at first flow This is because the UV lamp emits heat to kill bacteria When turning on a tap let the water run for a short time to purge any warm water Lamp Ballast Operation Press the mode button to cycle the display between lamp life remaining and total running days Press and hold the mode button to reset lamp life timer Press and hold on the mode button to silence th...

Страница 12: ...ity and usage You can obtain replacement cartridges from your local Puretec dealer To maintain performance warranty and Australian Standards use genuine Puretec replacements Replacement Parts HYBRID R10 HYBRID R11 Stage 1 Cartridge PL05MP1 PL05MP2 Stage 2 Cartridge CB05MP1 CB05MP2 Stage 3 Cartridge PX01MP1 PX01MP2 Stage 4 UV Lamp RL6 RL6 Quartz Sleeve RQS6 RQS6 Replace cartridges every 6 months We...

Страница 13: ...ood grade silicone lubricant or similar 5 Remove all packaging from new filter cartridges and insert into housing bowls making sure cartridges are properly seated over the spigot in base of the bowls Remember to record the model number of the cartridges you use 6 Hold bowls upright while screwing in the housings Make certain that the spigot in the housing heads is located centrally to the cartridg...

Страница 14: ...f lamp is soiled please clean lamp with an alcohol based cleaner 4 Secure the safety cap on the aluminium nut end Connect the ground wire to the chamber Plug in power connector Make sure that the GREEN LED is illuminated 5 Restore water supply and check the unit for leaks Re check the unit after 1 hour Note For initial use wait 3 5 minutes to allow water to pass through the whole unit Turn on a do...

Страница 15: ... the quartz sleeve from the top out of the chamber 6 Clean the quartz sleeve with an alcohol based cleaner if necessary 7 Slide the sleeve into the top and carefully slide down through the bottom opening Place the bottom O ring on the sleeve and screw the bottom nut on to the chamber while still holding the sleeve from the top Gently tap the sleeve to ensure that it sitting firmly on the bottom nu...

Страница 16: ...ter supply and check unit for leaks Re check the unit after 1 hour Note For initial use wait 3 5 minutes to allow water to pass through the whole unit Turn on a downstream tap to let the water flow through the unit for 2 3 minutes to release any air and impurities from system 13 Reset the lamp timer by pressing the mode button until an audible beep sounds indicating that the lamp timer has been re...

Страница 17: ...talled Lamp sleeve assembly not properly installed too tight or not tight enough Control humidity or relocate unit Inspect and replace if deteriorated Check O rings are in place Tighten assembly hand tight System is operating but water tests reveal bacterial contamination Equipment downstream of UV system is acting as a breeding ground for pathogens Pathogens are residing in the distribution lines...

Страница 18: ... Lubricate o rings with suitable sealant Remove sump check for cartridge damage re assemble ensuring cartridge is centered Red lamp blinks and buzzer sounds Lamp has reached or nearing the maximum lamp life Lamp is disconnected or faulty Replace lamp on or before lamp counter reached 0 Check lamp connection replace if needed Display flashing Power interruption Reset ballast Error Code A3 on ballas...

Страница 19: ...or claimed False and incorrect claims will be pursued at Puretec s discretion including chargeable inspection and labour costs incurred Warranty Australia This warranty is given by Puretec Pty Ltd ABN 44 164 806 688 37 43 Brodie Road Lonsdale SA 5160 telephone no 1300 140 140 and email at sales puretec com au This warranty is provided in addition to other rights and remedies you have under law Our...

Страница 20: ......

Отзывы: