5
INSTALLATION
The The Crystal Pure 3.0 ABG electrolytic cell and flow detection switch will be
damaged by freezing water, similar to other pool components that require proper
winterization. In areas of the country that experience severe or extended periods of
freezing temperatures, be sure to drain all water from the pump, filter, supply line, and
return line prior to freezing conditions.
INSTALL THE CONTROL
The The Crystal Pure 3.0 ABG control unit must be mounted a minimum of 6 ft. (2
meters) horizontal distance (or more if local codes require) away from the pool.
The control is designed to mount vertically on a flat surface with the knockouts facing
downward and not to block the four sides of the control.
Do not mount the The Crystal Pure 3.0 ABG in a panel or tightly enclosed space.
SYSTEM OVERVIEW
INSTALL THE CELL
To install the cell and flow switch, refer to the picture below. Flow switch is
installed after the cell. When using the hose adaptors, remove the O-ring from the
pipe union tailpiece and install them in the hose tailpieces. Tighten all union nuts
BY HAND
for a watertight seal.
Содержание Crystal Pure 3.0 ABG
Страница 1: ...SALT CHLORINATOR FOR ABOVE GROUND POOLS Crystal Pure 3 0 ABG rystal Pure 3 0 ABG...
Страница 6: ...4...