2.1.1 Receipt inspection
NOTE
The following information regarding receiving is only offered as a general guideline
to the customer. PUMPIRAN requires that all receiving be conducted in accordance
with specifications set forth in Chapter 3, Jobsite Receiving and Protection from API
Recommended Practices 686/PIP REIE 686, First Edition.
The pump and its associated equipment were carefully inspected at the factory prior to shipment to
ensure quality compliance. It is suggested that the pump be inspected upon arrival and that any
irregularities or damage be reported to the carrier immediately.
The protective covers on the pump nozzles should be in place and undamaged.
2.1.2 Unpacking
The pump should arrive already mounted on the base plate and it is therefore suggested that the unpacking of
the equipment should proceed per instruction as outlined in this manual.
In general, care is to be taken when removing crating, coverings, and strapping in order not to damage any
auxiliary equipment and/or the paint finish.
2.1.3 Paint/rust preventive
Internal parts of the pump and bearing housings are protected prior to shipment with a rust preventive such as
Dasco guard 2408M. This can be removed with petroleum solvents.
External non-machined surfaces are painted with one of applicable PUMPIRAN coating. Parts ordered
separately are protected with a rust preventive such as Dasco guard 2408M. This can be removed with
petroleum solvents.
2.2 Handling
Boxes, crates, pallets or cartons may be unloaded using forklift vehicles or slings dependent on their size and
construction.
2.3 Lifting
Caution
To avoid distortion, the pump unit should be lifted as shown.
2.3.1 Lifting equipment
NOTE
The following information regarding lifting is only offered as a general guideline.
PUMPIRAN requires that all lifting and rigging be performed in accordance with
specifications set forth in Chapter 2, Lifting and Rigging from API Recommended
Practices 686/PIP REIE 686, First Edition.