
9 (15)
K152/202/203/252/302.58.0101.Eng/Digital
SERVICE INSTRUCTION
K 152, 202, 203, 252, 302
Disassembly of Cable Entry
If water has penetrated through the cable entry into the junction
box, the cable entry bushings should be replaced. Remove strain
relief clamp on cable entry prior to unscrewing cable entry body.
Pull out cable, rubber bushing and washers.
Assembly
Prior to assembly, clean all parts carefully especially 0-ring
groves and mating surfaces. Grease or oil 0-rings to eliminate
damage during assembly. Put some grease or oil on screw threads
to simplify disassembly during future overhaul.
Assembly of Cable Entry
Measure inner diameter of cable entry rubber bushing to see that
it corresponds to cable diameter. Place rubber bushing and
washers (one (1) on each side of the bushing) on the cable.
Pull cable through the junction box cover, far enough to let the
rubber bushing seat on a non-deformed portion of the cable.
Tighten the cable entry body. Fit the strain relief clamp in such a
way that it prevents the cable entry from loosening.
Содержание K 152
Страница 1: ...K 152 202 203 252 302 SERVICE INSTRUCTION 1 15 K152 202 203 252 302 58 0101 Eng Digital ...
Страница 16: ......