Pulsar GREEN POWER plus HPSBOC 20A12E Скачать руководство пользователя страница 6

www.pulsar.pl                                                      HPSBOC20A12E                                                           

GREEN POWER plus

  

 

 

6

 

        

Table 5. Operation safety  

Protection class PN-EN 60950-1:2007 

I (first) 

Protection grade PN-EN 60529: 2002 (U) 

IP20 

Electrical strength of insulation: 
- between input and output circuits of the PSU (I/P-O/P) 
- between input circuit and PE protection circuit (I/P-FG) 
- between output circuit and PE protection circuit (O/P-FG) 

 
3000 V/AC min. 
1500 V/AC min. 
  500 V/AC min. 

Insulation resistance: 
- between input circuit and output or protection circuit 

 
100 MΩ, 500V/DC  

     Table 6. Operating parameters  

Operating temperature 

-

10ºC...+40ºC (see: chart 1) 

Storage temperature 

-

20ºC...+60ºC 

Environmental class 

ii 

Relative humidity 

20%...90%, without condensation 

Vibrations during operation 

unacceptable 

Impulse waves during operation 

unacceptable 

Direct insulation 

unacceptable 

Vibrations and impulse waves during transport 

According to PN-83/T-42106 

 

 

 

Chart 1. Acceptable output current from the PSU depending on ambient temperature. 

 

 
2. Installation. 

 

2.1 Requirements. 

            

The buffer PSU shall be mounted by a qualified installer with appropriate permissions and qualifications for 

230V/AC installations and low-voltage installations (required and necessary for a given country). The device shall 
be mounted in confined spaces, according to the environment class II, with normal air humidity (RH=90% max. 
without condensation) and the temperature from -

10°C to +40°C. The PSU shall work in a vertical position that 

guarantees sufficient convectional air-flow through ventilating holes of the enclosure. 

 

Before installation, prepare a PSU load balance. 

 

1.  Output current 18A + 2A battery charge

*

 

2.  Output current 16A + 4A battery charge

*

 

3.  Output current 12A + 8A battery charge

*

 

                                                Total device c battery: 20A max

*

 
As the PSU is designed for a continuous operation and is not equipped with a power-switch, therefore an 

appropriate  overload  protection  shall  be  guaranteed  in  the  power  supply  circuit.  Moreover,  the  user  shall  be 
informed  about  the  method  of  unplugging  (usually  through  assigning  an  appropriate  fuse  in  the  fuse-box).  The 
electrical system shall follow valid standards and regulations. 

 

 

                                                 

*

 

See chart 1

 

Содержание GREEN POWER plus HPSBOC 20A12E

Страница 1: ...HPSBOC 20A12E v 1 0 HPSBOC 13 8V 20A 65Ah OC Buffer switch mode power supply unit with technical outputs EN Edition 1 from 04 03 2015 Supercedes edition GREEN POWER plus...

Страница 2: ...tallation procedure 3 Operating status indication 3 1 LED indication of operating status 3 2 Technical outputs 4 Operation and use 4 1 Overload or short circuit of the PSU output SCP on 4 2 Disconnect...

Страница 3: ...tput indicating DC absence PSU failure relay type 6 LoB output indicating battery low voltage relay type 7 EPS AC absence technical output OC type 8 PSU output indicating DC absence PSU failure OC typ...

Страница 4: ...2 Description of PSU components and connectors fig 3 Element no Fig 3 Description 1 PSU module 2 TAMPER contact sabotage protection NC Fig 3 The view of the PSU 1 4 Specifications electrical parameter...

Страница 5: ...indicating unwanted opening of the PSU s enclosure a microswitch NC contacts enclosure closed 0 5A 50V DC max LED indication AC diode indicating AC power status DC diode indicating DC power status at...

Страница 6: ...llation 2 1 Requirements The buffer PSU shall be mounted by a qualified installer with appropriate permissions and qualifications for 230V AC installations and low voltage installations required and n...

Страница 7: ...and fully operational shock protection circuit is UNACCEPTABLE It can cause a device failure or an electric shock 4 Connect the receivers cables to the terminals V V of the PSU module 5 Connect the po...

Страница 8: ...ut is connected to ground L level 0V In case of absence of DC voltage at the output e g short circuit the output is switched into high impedance state hi Z relay output In case of a failure the contac...

Страница 9: ...ipped with the discharged battery disconnection system During the battery assisted operation reducing voltage below 9 5 V at the battery terminals will cause battery disconnection 4 3 Maintenance Any...

Страница 10: ...thin 14 days from the delivery to the service centre of the manufacturer 6 The repair period mentioned in item 5 may be prolonged if there are no technical possibilities to carry out the repairs or if...

Отзывы: