Page
48
P973 Start Day
Use this parameter to enter the day of the week (P974) that Daylight Saving
Time is to start.
Option
Description
2 = Monday
DST will start on a Monday
3 = Tuesday
DST will start on a Tuesday
4 = Wednesday
DST will start on a Wednesday
5 = Thursday
DST will start on a Thursday
6 = Friday
DST will start on a Friday
7 = Saturday
DST will start on a Saturday
8 = Sunday (Default)
DST will start on a Sunday
P974 Start Week
This parameter will determine the
week
of the month (
P975
)
in which
Daylight Saving Time
is to
start
.
Option
Description
1 = Week 1
DST
will
start
on
day
(
P973
) in the
first
week
(
P974
) of the
month
(
P975
).
2 = Week 2
DST
will
start
on
day
(
P973
) in the
second
week (
P974
) of the
month
(
P975
).
3 = Week 3
DST
will
start
on
day
(
P973
) in the
third
week (
P974
) of the
month
(
P975
).
4 = Week 4
DST
will
start
on
day
(
P973
) in the
fourth
week (
P974
) of the
month
(
P975
).
5 = Last (Default)
DST
will
start
on
day
(
P973
) in the
last
week
(
P974
) of the
month
(
P975
).
Содержание Flow Monitor
Страница 1: ...Flow Monitor INSTRUCTION MANUAL...
Страница 2: ......
Страница 4: ......
Страница 10: ...Page 4 EU Declaration of Conformity...
Страница 17: ...Page 11 Your Flow Monitor can be programmed directly via the integral keypad...
Страница 26: ...Page 20 This page left blank intentionally...
Страница 61: ...Page 55...