background image

www.pulsar.pl   

 

 

 

AWZ333 

 

 

 

 

 

 

 
 

During normal PSU operation, the BS technical output is cut from ground (-AUX). In case lf 230V AC power outage, 
it is connected to ground (-AUX) after a time set by Z1, Z2 pins. 
    - 

AW 

output indicating failure 

During normal PSU operation, the AW technical output is connected to ground. If a failure occurs, the output is cut 
from ground. 
6. During battery-assisted operation, it is possible to determine time necessary for battery disconnection by the  

Z3, Z4 

pins when the voltage at its terminals drops below 10V. 

7. On the 

CHARGE 

pins, determine the battery charging current: 

    Ibat = 0,4 A

  max. – jumper on  

    

Ibat = 0,9 A

 max. – jumper off (unacceptable

 for: AWZ110, AWZ224). 

8. Restore the 230V AC power and plug the line fuse protecting the primal circuit of the transformer. 
Check the LED indication for PSU power status. 

Output voltage of the PSU, without load: U = 13,8V DC.  
During battery charge, voltage can amount to U = 11 V÷13,8V DC 

9. Connect the battery in accordance with the markings:“+” red, „-„ black) 
Mount the battery with a 700x 8mm clamp, following the procedure according to Fig. 5 
 

- put the battery into the enclosure 

 

- lead the clamp through the left A hole  

 

- lead the clamp over the up side of the battery 

 

- lead the clamp through the B hole  

 

- lead the end of the clamp into the terminal hole 

 

- pull the clamp with force of 150N-200N 

 

- cut the jutting piece of the tape 

10. With the 

STOP

 button, initiate or finish a dynamic battery test. 

Deactivating the test turns out the PSU failure indication at the AW output, but it does not affect the protection 
system against complete battery discharge. 
11. Run the PSU test: check the LED and acoustic indication (Tab. 7), AW technical output; through: 

cutting off the 230V AC current:

 LED and acoustic indications – immediately; the BS technical output – 

after some time, determined by Z1, Z2 pins. 

battery disconnection:

 LED indication, acoustic indication and the AW technical output – after a battery 

test have been completed (approx. 10 min.) 
12. With the 

STOP

 button, initiate or finish a dynamic battery test. 

13. With the 

ZB 

pins, decide whether the acoustic indication stall be on (jumper on), or off (jumper off) 

14. Once the tests and operation control have been completed, the enclosure can be locked. 

 

 

Fig. 5. Battery mounting procedure. 

 

 
 

Содержание AWZ 333

Страница 1: ...AWZ 333 v 2 1 AWZ 13 8V 3A 17Ah LM Linear Buffer Power Supply Unit EN Edition 4 from 16 09 2013 Supercedes the edition 3 from 24 02 2012...

Страница 2: ...1 Technical description 1 1 General description 1 2 Principle of operation 1 3 Block diagram 1 4 Description of PSU components and connectors 1 5 Specifications 2 Installation 2 1 Requirements 2 2 In...

Страница 3: ...tion of the 230V mains supply the PSU automatically charges up and preserves the battery PSU operating status is indicated by LEDs on the faceplate red LED failure indication additionally failure stat...

Страница 4: ...upply output of the battery BAT red BAT black 7 RED DIODE LED indication 8 GREEN DIODE LED indication 9 CHARGE pin 10 AC AC power connector 11 Connectors TAMPER contacts of the sabotage protection swi...

Страница 5: ...he view of the PSU 1 5 Specifications electrical specifications tab 3 mechanical specifications tab 4 operation safety tab 5 operating specifications tab 6 Uwy f Io diagram Fig 4 Electrical specificat...

Страница 6: ...level 0V microswitch NC contacts enclosure closed 0 5A 50V DC max LED indication LEDs AC DC power status failure Acoustic indication piezoelectric indicator 75dB 0 3m ON OFF function F1 fuse F 5A F2 f...

Страница 7: ...iate fuse in the fuse box The electrical system shall follow valid standards and regulations 2 2 Installation procedure Before installation make sure that the voltage in the 230V power supply circuit...

Страница 8: ...8mm clamp following the procedure according to Fig 5 put the battery into the enclosure lead the clamp through the left A hole lead the clamp over the up side of the battery lead the clamp through th...

Страница 9: ...cause disconnect the load and connect after 30 60 s 4 too high output voltage Uout 14 5V damaged voltage regulator wrong setting of the P1 potentiometer check the setting of the P1 potentiometer 5 PSU...

Страница 10: ...g the PSU from a battery push the START button on the device s board and hold for 5 seconds Finishing the battery assisted operation push the STOP button on the device s board and hold for 2 seconds T...

Страница 11: ...should be limited Characteristics for a 17Ah 12V SLA for grade 1 12h current Id 1 4A 4 6 PSU overload The PSU is equipped with an output protection due to a PTC polymer fuse If the load of the PSU exc...

Страница 12: ...s to carry out the repairs or if the equipment has been conditionally accepted due to the breaking warranty terms by the claimant 7 All the services rendered by force of the warranty are carried out a...