background image

11 

 

 

8.0  PULSAlarm® Reagent Head 

 

The PULSAlarm® leak detection  reagent head assembly consists of  reagent head, 
leak detection  diaphragm, suction and discharge  check valves, bleed port, and 
optional  switch and gauge.  The reagent head,  diaphragm, suction and discharge 
check valves are the only parts of the  pump to contact the process liquid; 
consequently, maintenance is critical  to pump performance. 

 
 
 

 
 
 

             

                                    

 

 
 
 

9.0  PULSAlarm® Leak Detection Diaphragm 

 

Double, or sandwiched, PTFE diaphragms are sealed at their peripheries to an 
intermediate metal spacer ring. The space between the diaphragms is sealed so that the 
diaphragm functions like a standard single diaphragm.  The space between the 
diaphragms is filled with a small amount of fluid. This space is connected to an electrical 
switch (optional) that actuates in response to a buildup of pressure resulting from rupture 
of either or both diaphragms. 
 
Switch operation can be used to perform any external function, typically to signal an 
alarm or turn off the pump.    

 

During installation, ensure that adequate space is available around the reagent 
head  assembly to allow for service of both the pressure switch and the diaphragm 
assembly.

 

 
 

 

Содержание PULSAlarm Pulsa Series

Страница 1: ...Ex db IIB T5 Gb Ex tb IIIC T100 C Db IP66 Bulletin IOM PUL 1007 Rev F THIS DOCUMENT CONTAINS CHARACTERISTICS CONTROLLED BY U L FILE E186527 CHANGES REQUIRE AGENCY APPROVAL PULSAlarm LEAK DETECTION SW...

Страница 2: ...ation of the original parts by Pulsafeeder personnel Parts returned for warranty considerations which are good will be sent back freight collect Any field modifications will void the warranty Out of w...

Страница 3: ...Pulsa Series PulsaPro and Pulsar and PULSAlarm are registered trademarks of Pulsafeeder Inc Revision History Revision Implemented By Revision Date Approved By Approval Date Reason B Engineering 04 27...

Страница 4: ...5 0 Theory of Operation 9 6 0 Setup Pump with Leak Detection 9 7 0 Setup Switch Assembly 9 8 0 PULSAlarm Reagent Head 11 9 0 PULSAlarm Leak Detection Diaphragm 11 10 0 Diaphragm Construction 12 11 0 P...

Страница 5: ...tor run the equipment in the most efficient manner possible These Tips are drawn from the knowledge and experience of our staff engineers and input from the field 2 0 Foreword The equipment to which t...

Страница 6: ...g pumped from the hydraulic fluid that is moving diaphragm back and forth causing its pumping action To be certain that the diaphragm is properly sealed the PULSAlarm Leak Detection System can be incl...

Страница 7: ...r Quality System I Explosive atmosphere II Explosive Protection II Protection Methods flameproof enclosure III Gas Group III Gas Group IV Equipment Category IV Temperature Code or Temperature Rating m...

Страница 8: ...phragm both normally open and normally closed contacts are standard It is recommended that the pump be stopped in the event such a leak is detected Immediate attention to the problem followed by clean...

Страница 9: ...ntary ground If equipped with an optional pressure switch shown in LD FIG 4 install electrical wiring and conduit in accordance with local electrical codes The PULSAlarm switch is rated as follows Vol...

Страница 10: ...their peripheries to an intermediate metal spacer ring The space between the diaphragms is sealed so that the diaphragm functions like a standard single diaphragm The space between the diaphragms is...

Страница 11: ...12 10 0 Diaphragm Construction In some cases diaphragm components are retained with adhesive It is not present for sealing purposes Diaphragm construction...

Страница 12: ...aphragm 1 Disconnect the power source to the drive motor apply all necessary engineering controls e g lockout tagout 2 Relieve all pressure from the piping system and close the inlet and outlet shutof...

Страница 13: ...g force Torque to the values recommended in the Installation Operation and Maintenance manual appropriate to the pump 3 Apply sealing compound to the gauge pressure switch assembly threads and reinsta...

Страница 14: ...surrounding the work is not hazardous use the proper Personal Protective Equipment relieve pressure drain fluid from piping and lockout the pump motor 2 Follow complete re assembly of the diaphragm r...

Страница 15: ...in the outlet side tubing not just bubbles without any vacuum pressure 10 Release the vacuum to check for a clear level of fluid in the outlet side tubing If there is no level restore the vacuum by p...

Страница 16: ...h from 0 to 100 26 Slowly increase the discharge pressure to full operating pressure 27 Continue to run the pump During this time excess barrier fluid will be displaced from the system into the length...

Страница 17: ...18...

Страница 18: ...Bulletin IOM PUL 1007 Rev F PULSAlarm LEAK DETECTION SYSTEM A unit of IDEX Corporation 2883 Brighton Henrietta Town Line Road Rochester NY 14623 1 585 292 8000 pulsa com pulsa idexcorp com...