19
www.tpcdental.com
Operating Speed Controls
Operating speeds are preset at factory, but can be changed if desired.
·
TV1 = Base up flow control
·
TV2 = Base down Flow Control
·
TV3 = Back up flow control
·
TV4 = Back down flow control
When adjusting the flow control valves counter clockwise turns will open / increase flow.
Turning the valve clockwise will close the valve and decrease the flow.
Don’t open or close a flow control valve completely. Its best to make adjustments in quarter turn
rotations only.
Содержание Mirage 3000
Страница 16: ...16 www tpcdental com Main PCB Board ...
Страница 17: ...17 www tpcdental com Wiring schematic 1 ...
Страница 18: ...18 www tpcdental com Wiring schematic ...