11
MGH Series - Manual
Rev030921
© 2021 PS Industries
®
Incorporated. All Rights Reserved.
Installation
DETAIL L
4
3
/
16
”
Stop
Jamb
Field Fasten
DETAIL K
20”
11”
3
STEP 12.
Verify Gate Assembly latches in both open and closed positions.
NOTICE
If preferred, remove colored circle decals once Gate is fully assembled.
Step 12
Illustration I
FRONT VIEW
(Shown with Section Cuts)
Verify Gate Latch Assemblies
Operate in both Open and
Closed Positions
IX. Installation of Optional Face Mount Track
A. Recommended Equipment: Scaffolding or Personnel Lift.
B. Once steps have been completed, continue with Shroud Assembly Installation on Page 5.
DANGER
OPENING MUST BE GUARDED OR INSTALLATION PERSONNEL MUST WEAR FALL PROTECTION
EQUIPMENT AND BE TIED OFF. DO NOT ALLOW PERSONNEL NEAR UNPROTECTED LEADING EDGE DURING
INSTALLATION!
IMPORTANT!
Installation steps are shown in
SLIDE DIRECTION:
LEFT
from Ground Side.
NOTICE
Installation Steps located on Page 12 are for Face Mount Locations
ONLY
. For Deck Mount Installations
refer to Page 5.