background image

17

MGH Series - Manual

Rev030921

© 2021 PS Industries

®

 Incorporated. All Rights Reserved.

Training and Operating Instructions

XV.  Training Instructions

A. PS Industries, Inc. recommends conducting formal operation training, and documenting the training, with 

all personnel who will operate the product and who will be working in the area that the product is located. 

Awareness of how the SafeMezz Horizontal Gate operates and the critical function it performs will improve 

the likelihood that the product is respected and safely utilized.

B. The PS Industries, Inc. SafeMezz Horizontal Gate is simple yet critical piece of safety equipment in many 

facilities. The SafeMezz Horizontal Gate, when in the closed and latched position, provides an effective 

fall protection barrier for personnel. There are several critical components that work together to ensure 

the SafeMezz Horizontal Gate will operate and perform the fall protection function. Key to performance 

and longevity of the product are the Inspection and Maintenance recommendations contained in the O&M 

Manual. The performance of the product is directly related to the proper operation and maintenance of the 

product.

NOTICE

 

Employers are responsible for providing supplemental training and guidelines specific to the Employer’s 

facility, additional safety requirements and OSHA Regulations specific to the Employer’s industry and 

specific facility safety policies. The manufacturer of the SafeMezz Horizontal Gate makes no claim to 

know the specific Employer’s Safety Policies or other Regulatory Safety guidelines. Employer may need to 

supplement or modify the training, inspection, maintenance, or operation instructions to meet additional 

requirements.

XVI.  Operating Instructions

 

CAUTION

CAUTION

 

For products that are approved for use as a means of fall protection, the product only serves as a 

means of fall protection when the product is in the closed and latched position. In applications where the product 

is positioned to protect a fall-edge, the person operating the product is required to implement another primary 

means of fall protection, whenever the product is not closed and latched.

NOTICE

 

If you are placing material in the drop area to be retrieved by the forklift, place material prior to opening the 

SafeMezz Horizontal Gate.

 

WARNING

 

Always operate the manually operated SafeMezz Horizontal Gate from the Pull Handle.

A. Before Operation Checks:

1

The gate is NOT tagged-out for maintenance faults.

TRUE

FALSE

2

Track is clean and free of debris.

TRUE

FALSE

3

Upon visual inspection of the gate system, all components are in place.

TRUE

FALSE

4

Drop area is clean and free of debris or obstructions.

TRUE

FALSE

5

All personnel working in the area are WARNED of Gate Opening.

TRUE

FALSE

6

No personnel within 6 feet of opening.

TRUE

FALSE

 

WARNING

 

If ANY Before Operation Checks are “FALSE” - DO NOT OPERATE!! Correct/Repair prior to operation.

B. Operation:

STEP 1.

 

Pull upward on the Latch Release Knob to release the gate latch.

STEP 2.

 

Utilizing the Red Pull Handle, walk the gate to the fully open position and ensure gate is latched. State at the 

pull handle end of the gate.

 

 

WARNING

 

DO NOT APPROACH THE OPEN LEADING EDGE.

 

 

WARNING

 

DO NOT LEAVE OPEN GATE UNATTENDED.

STEP 3.

 

When the material has been placed or removed from the drop area. Pull upward on the Latch Release Knob 

to release the gate latch.

STEP 4.

 

Utilizing the Red Pull Handle, walk the gate to the fully closed position and ensure the gate is latched.

Содержание Safemezz MGH Series

Страница 1: ...e contents of this manual and the specifications of this product are subject to change without notice PS Safety AccessTM reserves the right to make changes without notice in the specifications and mat...

Страница 2: ...s designed to meet 1 OSHA Railing Standard 1910 28 and OSHA 1910 29 B Operation in a manner other than intended could result in damage or less than acceptable performance at time of need for which the...

Страница 3: ...e Mount Systems 1 Scaffolding or Personnel Lift B Tools 1 One 1 Drill for Anchoring 2 One 1 Phillips Screwdriver 3 One 1 Pliers 4 One 1 9 16 Wrench 5 One 1 1 2 Wrench 6 One 1 7 16 Wrench 7 One 1 Tape...

Страница 4: ...irection a Look up at the mezzanine deck from the ground level to determine what slide direction will be needed 1 Slide Direction RIGHT install your gate assembly using the holes marked with green dec...

Страница 5: ...dge of opening b Field fasten Track Assembly to your existing structure using factory located holes Fasteners supplied by the Installer CRITICAL Ensure mounting surface is capable of supporting all lo...

Страница 6: ...tion Upper Hole Location Leading End Blue Decal Blue Decal STEP 4 Install Manual Latch Assemblies using supplied hardware from the Manual Latch Hardware Kit a Attach both Manual Latch Assemblies as sh...

Страница 7: ...te Guide Block to top of Gate Assembly using 5 16 carriage bolts washers and nylock nuts a The notch located in Guide Block MUST be orientated towards existing structure refer to Detail F for correct...

Страница 8: ...o the Gate with 5 16 carriage bolts washers and nylock nuts a Handle MUST be installed on the trailing end of the Gate Trailing End STEP 8 Install Shroud Assembly to top of Track Assembly as shown a A...

Страница 9: ...to Track and Shroud Assemblies a Slide Gate to fully open position Gate inside Track and Shroud Assemblies Shroud Assembly Step 9 Illustration I Track Assembly Shroud Assembly I SIDE VIEW Step 9 Illus...

Страница 10: ...ientation DECK VIEW Shown as Slide Direction LEFT STEP 11 Install Stop Jamb onto Existing Structure a Keep Gate Assembly in the fully open position Gate inside Track and Shroud Assemblies b Field fast...

Страница 11: ...th Open and Closed Positions IX Installation of Optional Face Mount Track A Recommended Equipment Scaffolding or Personnel Lift B Once steps have been completed continue with Shroud Assembly Installat...

Страница 12: ...responsibility of the Installer Fasteners must be of sufficient size grade appropriate for anchoring material etc to accept the potential loading Consult qualified Structural Engineer STEP 2 Installa...

Страница 13: ...OTTER 1 8x 3 4 ZN 2 503403 14 MGH UHMW GATE GUIDE BLOCK 1 511500 15 BOLT CARRIAGE5 16 18X2 1 4 GR5 4 506502 16 MGH ROUND PULL HANDLE PCR 1 511496 17 MGH MANUAL LATCH ASSEMBLY LH 1 511517 18 MGH MANUAL...

Страница 14: ...Parts Diagram XIII Replacement Parts Diagram A These Replacement Parts Diagrams for all SafeMezz Horizontal Gate Manual Models B The Replacement Parts List is located on Page 13 DETAIL Q 13 O P Q DETA...

Страница 15: ...e shroud block Shroud Block fasteners Fasteners must be present and be snug tight connections pulled into firm contact by the bolt no gaps between material Tighten fasteners to snug tight Replace any...

Страница 16: ...ns and configurations Gate is not rusting corroded Minor surface rust corrosion No scaling or pitting of material Clean and touch up minor surface rust If rust scale or pitting is present replace gate...

Страница 17: ...maintenance or operation instructions to meet additional requirements XVI Operating Instructions CAUTION CAUTION For products that are approved for use as a means of fall protection the product only s...

Страница 18: ...t Repair prior to operation D After Operation Checks 1 Any fault identified have been documented and reported to maintenance TRUE FALSE 2 If faults were identified gate has been TAGGED OUT OF SERVICE...

Страница 19: ...iration of the above stated Limited Warranty period together with proof of purchase Contact PS Industries at the address shown below PS Industries Incorporated Toll Free 877 446 1519 Attention Warrant...

Страница 20: ...877 446 1519 4psinfo psindustries com pssafetyaccess com 1150 South 48th Street Grand Forks ND 58201 Product Registration psindustries com contact register your product...

Отзывы: