background image

4

MGH Series - Manual

Rev030921

© 2021 PS Industries

®

 Incorporated. All Rights Reserved.

Installation

SLIDE DIRECTION: 

RIGHT

Step 1

Illustration I

Slide

SLIDE DIRECTION: 

LEFT

Step 1

Illustration II

Slide

View from 

Ground Level

View from 

Ground Level

VIII. Horizontal Gate Installation 

A. Refer to replacement parts list on Page 13 and 14 for part item numbers and descriptions.
B. Colored circle decals are provided for easier installation, remove once installation is complete.

STEP 1. 

Determine your Slide Direction.

a. Look up at the mezzanine deck from the ground level to determine what slide direction will be needed.

1). Slide Direction 

RIGHT

: install your gate assembly using the holes marked with 

green

 decals.

2). Slide Direction 

LEFT

: install your gate assembly using the holes marked with 

blue

 decals.

CRITICAL

 

Your gate should open in the direction that allows the most side room for operation.

IMPORTANT!

 

Installation steps are shown in 

SLIDE DIRECTION: 

LEFT 

from Deck Side. Install your gate assembly 

using the hole locations marked with 

blue

 decals.

NOTICE

 

Installation Step 2 located on Page 5 is for Deck Mount Locations 

ONLY

. For Face Mount Installations refer 

to Page 13 before continuing to Step 3.

Содержание Safemezz MGH Series

Страница 1: ...e contents of this manual and the specifications of this product are subject to change without notice PS Safety AccessTM reserves the right to make changes without notice in the specifications and mat...

Страница 2: ...s designed to meet 1 OSHA Railing Standard 1910 28 and OSHA 1910 29 B Operation in a manner other than intended could result in damage or less than acceptable performance at time of need for which the...

Страница 3: ...e Mount Systems 1 Scaffolding or Personnel Lift B Tools 1 One 1 Drill for Anchoring 2 One 1 Phillips Screwdriver 3 One 1 Pliers 4 One 1 9 16 Wrench 5 One 1 1 2 Wrench 6 One 1 7 16 Wrench 7 One 1 Tape...

Страница 4: ...irection a Look up at the mezzanine deck from the ground level to determine what slide direction will be needed 1 Slide Direction RIGHT install your gate assembly using the holes marked with green dec...

Страница 5: ...dge of opening b Field fasten Track Assembly to your existing structure using factory located holes Fasteners supplied by the Installer CRITICAL Ensure mounting surface is capable of supporting all lo...

Страница 6: ...tion Upper Hole Location Leading End Blue Decal Blue Decal STEP 4 Install Manual Latch Assemblies using supplied hardware from the Manual Latch Hardware Kit a Attach both Manual Latch Assemblies as sh...

Страница 7: ...te Guide Block to top of Gate Assembly using 5 16 carriage bolts washers and nylock nuts a The notch located in Guide Block MUST be orientated towards existing structure refer to Detail F for correct...

Страница 8: ...o the Gate with 5 16 carriage bolts washers and nylock nuts a Handle MUST be installed on the trailing end of the Gate Trailing End STEP 8 Install Shroud Assembly to top of Track Assembly as shown a A...

Страница 9: ...to Track and Shroud Assemblies a Slide Gate to fully open position Gate inside Track and Shroud Assemblies Shroud Assembly Step 9 Illustration I Track Assembly Shroud Assembly I SIDE VIEW Step 9 Illus...

Страница 10: ...ientation DECK VIEW Shown as Slide Direction LEFT STEP 11 Install Stop Jamb onto Existing Structure a Keep Gate Assembly in the fully open position Gate inside Track and Shroud Assemblies b Field fast...

Страница 11: ...th Open and Closed Positions IX Installation of Optional Face Mount Track A Recommended Equipment Scaffolding or Personnel Lift B Once steps have been completed continue with Shroud Assembly Installat...

Страница 12: ...responsibility of the Installer Fasteners must be of sufficient size grade appropriate for anchoring material etc to accept the potential loading Consult qualified Structural Engineer STEP 2 Installa...

Страница 13: ...OTTER 1 8x 3 4 ZN 2 503403 14 MGH UHMW GATE GUIDE BLOCK 1 511500 15 BOLT CARRIAGE5 16 18X2 1 4 GR5 4 506502 16 MGH ROUND PULL HANDLE PCR 1 511496 17 MGH MANUAL LATCH ASSEMBLY LH 1 511517 18 MGH MANUAL...

Страница 14: ...Parts Diagram XIII Replacement Parts Diagram A These Replacement Parts Diagrams for all SafeMezz Horizontal Gate Manual Models B The Replacement Parts List is located on Page 13 DETAIL Q 13 O P Q DETA...

Страница 15: ...e shroud block Shroud Block fasteners Fasteners must be present and be snug tight connections pulled into firm contact by the bolt no gaps between material Tighten fasteners to snug tight Replace any...

Страница 16: ...ns and configurations Gate is not rusting corroded Minor surface rust corrosion No scaling or pitting of material Clean and touch up minor surface rust If rust scale or pitting is present replace gate...

Страница 17: ...maintenance or operation instructions to meet additional requirements XVI Operating Instructions CAUTION CAUTION For products that are approved for use as a means of fall protection the product only s...

Страница 18: ...t Repair prior to operation D After Operation Checks 1 Any fault identified have been documented and reported to maintenance TRUE FALSE 2 If faults were identified gate has been TAGGED OUT OF SERVICE...

Страница 19: ...iration of the above stated Limited Warranty period together with proof of purchase Contact PS Industries at the address shown below PS Industries Incorporated Toll Free 877 446 1519 Attention Warrant...

Страница 20: ...877 446 1519 4psinfo psindustries com pssafetyaccess com 1150 South 48th Street Grand Forks ND 58201 Product Registration psindustries com contact register your product...

Отзывы: