12
Smart Gate Series
Rev022520
© 2020 PS Industries
®
Incorporated. All Rights Reserved.
Disassembling Gate Instructions
VII. Disassembling Gate Instructions
NOTICE
Only complete depressurization process if disassembling Smart Gate.
DANGER
System under high pressure. Refer to depressurization instructions in Operations and Maintenance
Manual before doing any maintenance on the gate.
STEP 1.
Rotate gate to the open position (gate arms vertical) before proceeding with Step 2.
CAUTION
CAUTION
High internal gate forces! Before removing Gate Post baseplate fasteners, the gate must be in the open
position (gate arms vertical) so the dampeners are in a non-compressed state.
STEP 2.
Remove Gate Post from concrete floor anchors to free up the assembly and lay on the ground to enable
access to the dampeners.
STEP 3.
Use a screwdriver to gently tap alternating sides of the dampener mounting
3
/
8
”
shoulder bolt into the long
portion of the slot to relieve dampener pressure from
3
/
8
”
shoulder bolts.
DANGER
Keep fingers clear of dampener ends and installation slot.
NOTICE
To protect the Powder Coat finish, lay on cardboard.
STEP 4.
Remove
3
/
8
”
shoulder bolts at bolt ends of dampeners.
IMPORTANT!
RETURN TO INSTALLATION STEPS 12-14 TO INSTALL NEW DAMPENER, AS SHOWN IN THIS
OPERATIONS AND MAINTENANCE MANUAL.