8
Smart Gate Series
Rev022520
© 2020 PS Industries
®
Incorporated. All Rights Reserved.
Installation
NOTICE
Base plates are slotted to allow adjustment for alignment.
STEP 9.
Mark out holes for the Gate Catch and anchor with concrete floor anchors.
Step 9
Illustration
Leave
1
/
4
”
of space between Gate End and inside of Gate Catch.
TOP VIEW
STEP 8.
Use rubber mallet to gently hammer flange bearings into both sides of 1
3
/
4
” Upper Lift Arm.
a. Slide the Gate End (
blue decal
) over the 1
3
/
4
” Upper Lift Arm (
blue decal
).
b. Insert
3
/
8
” x 2
3
/
4
” hex bolt and tighten
3
/
8
” nylock nut.
Step 8
Illustration A
Step 8
Illustration B
10.2
10.9
10.4
2
10.6
Blue
Decals