38, Rue Charles de Gaulle F-94140 Paris/Alfortville - www.prudhommesa.com - Tél. : +33
o
1 45 18 19 20 - Fax : +33
o
1 45 18 19 21
prudhomme S.a
D
ocumen
t non c
on
tr
ac
tuel
, sous r
éser
ve
de modifi
ca
tion - Repr
oduc
tion in
te
rdit
e.
-
FP -
Help - F
a
q
- Make sure that the bolt (LR150/PR7) power supply cables (output K)
do not touch each other in the box AMC150.
- Isolate successively each bolt by unplugged them, to identify the bolt
in short-circuit.
- Change the fuse by another one of the same calibre.
- Do not switched on the AMC150 while the fuse holder is empty. You
might damage the card.
Ind
. A du 12
/10
/2009
70
210
Material installed :
AMC150/M_ + LR150/PR7 + CPP + BPR (option) + EM150 + RC150 + NSE and NSR150
The LR150 bolts are blocked, the lift arrives at the fl oor and
the door remains blocked.
The lift is at the fl oor. Sometimes, the door would open and
sometimes it would not.
The AMC150 box rings continuously (it means that there is
not 24V coming out from the card).
The box AMC150 rings on and off (it means that we reach
minimum limit of charge in the batterie (24V)
- Check the connexion of the came signal (input F)
- Check the power of the transmitter (when the cad is on the fl oor). It
has to be equal to 24v.
- In the shaft, make sure the transmitter and the receptor are turned
on (green led).
- Check the distance between the transmitter and the receptor, It
has to be 30cm minimum away form another.
- Make sure that the transmitter’s signal is actually transmitted to
the receptor (the green led is on).
- Check the mains in the fuse F1.
- Check the power coming out from the transformator (output T).
- Make sure that the card is swirched on (led LD1).
- Check the battery charge (leds LD2 and LD3)
- Check the power of the battery. It should not go under 24V.
Malfunctions
Checking
When they switch on, nothing happens
- Check the supply of the AMC box (led LD1 on)
- Check the fuse F1.
When the switch on, the fuse F2 blows
M
ALFUNC
TIONS
CHECKS
F.A.Q
SAE-6