
- 38 -
I n s t a l l a t i o n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
T e c h n i c a l T r a i n i n g
Reminder of bathroom electrical protection zones
This range of boilers
cannot be installed in
zones 0, 1 or 2.
Water and gas connections:
1 Heating return 3/4 ‘‘
2 Cold water inlet 1/2 ‘‘
3 Gas 1/2 ‘‘
4 Domestic hot water flow 1/2 ‘‘
5 Heating flow 3/4 ‘‘
1
2
3
0
2,40 m
0,60 m
3 m
2,25 m
2,25 m
1
2
3
4
5
110
65
116
65
94
217
27
208
181
205
160
134
26
82
65
116
65
82