52
Version A
Mini-Cam
Proteus ExZ1
Steps for the Slow leak test
Prepare for this test with the inspection equipment pressures Compliant and
adequate, then:
•
Take a note of the inspection equipment pressures, then leave the
equipment powered on and unused for 30 minutes.
•
After 30 minutes, the pressures of the equipment should not have
appreciably decreased (it is OK if the pressures have increased; this is due
to the internals of the inspection equipment warming up).
•
If pressures HAVE appreciably decreased, or a pressure WARNING is
showing, the inspection equipment is NOT suitable for ATEX.
If this test fails, do not use the equipment for ATEX, and consult your
Mini-Cam Service team.
Steps for the Pressure-Drop Test
Prepare for this test with the inspection equipment pressures Compliant and
adequate, then:
• Ensure the OVERRIDE key is in the ATEX position.
•
Turn up the camera illumination (see section "Camera Function Keys"
in the Proteus Original Instruction Manual) such that the camera lights
are visibly ON.
•
Manually cause a release of the inspection equipment pressure, by
opening the purge valve slowly on the device.
The system should show a series of warnings as the pressure drops:
• Pressure low advisory
• Pressure low caution
• Pressure non-compliant
Содержание ATEX Zone 1
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 10: ...10 Version A Mini Cam Proteus ExZ1...
Страница 16: ...16 Version A Mini Cam Proteus ExZ1...
Страница 63: ...63 Version A Mini Cam Proteus ExZ1 Appendices...
Страница 69: ...69 Version A Mini Cam Proteus ExZ1 Notes...
Страница 70: ...70 Version A Mini Cam Proteus ExZ1 Notes...
Страница 71: ...71 Version A Mini Cam Proteus ExZ1...