
OPTIMAX
®
2010
15
Operation
E
n
g
li
s
h
Before use...
1.
Close water-drainage stop cock.
2.
Open water tap.
3.
Switch processor on.
4.
Check liquid level in replenishment and drainage collecting containers.
5.
Wait until the start-cycle has been completed or until Developer temperature
is reached.
6.
Run cleaning films through processor.
Working procedure
7.
Processing films:
Open the light protection cover, insert the film on the left of the feed tray, dur-
ing the feeding please watch the Film-feed-display “– –”.
After work...
8.
Switch the unit off.
9.
Close water tap.
10. Open water drainage stop cock
Stand-by mode:
When no film is being processed, the machine switches to Stand-by. The chemicals
remain at a constant temperature. The film transport and water inflow activate at in-
tervals to avoid crystallisation of the chemicals on the transport rollers. Entry of the
next film is possible at any time.
Attention:
Upon first operation and each refilling of a developer check
the function of the circulation pump and vent the pump if re-
quired (see page 9).
Do not place any
object on the proc-
essor.
Film exit
Drying
Washing
Fixing
Replenishment fixer
Fresh water inflow
Height-adjustable feet
Содержание optimax 2010
Страница 28: ...32 OPTIMAX 2010 Accessories...
Страница 45: ...OPTIMAX 2010 49 Electric Diagrams English...
Страница 46: ...50 OPTIMAX 2010 Electric Diagrams...
Страница 47: ...OPTIMAX 2010 51 Electric Diagrams English...
Страница 48: ...52 OPTIMAX 2010 Electric Diagrams...
Страница 52: ...56 OPTIMAX 2010...