SECTION 3
Pronar T743
3.7
FIGURE 3.5
Load box design
(1) auger conveyor IX (rear), (2) auger conveyor X (left front), (3) auger conveyor XI (right
front), (4) auger conveyor VIII (collecting), (5) auger intake control roof, (6) channel slide
cover, (7) bearing connector
On the front wall of the load box (inside container) all their intake control roof is bolted to
brace (5) – figure (3.5). By changing the height of the roof one regulates the speed of grain
flow to the collecting auger conveyor (4), placed in the lowest part of the container (beneath
roof). Remaining 4 auger conveyors are placed in two parallel channels of load box. Rear
auger conveyors (1) bearings are in rear chain gearing and bearing connectors (7) in central
part of load box. Auger conveyor (3), receiving torque from gearing shaft (placed on front wall
of load box) is connected to augur conveyor (1) from right side of trailer.
Содержание T743
Страница 2: ......
Страница 6: ......
Страница 11: ......
Страница 12: ...SECTION 1 BASIC INFORMATION ...
Страница 25: ...Pronar T743 SECTION 1 1 14 ...
Страница 26: ...SECTION 2 SAFETY ADVICE ...
Страница 44: ...SECTION 2 Pronar T743 2 19 ITEM DECAL MEANING OF SYMBOL 15 Hydraulic clutch operation information decal ...
Страница 46: ...SECTION 2 Pronar T743 2 21 FIGURE 2 3 Locations of information and warning decals ...
Страница 47: ...Pronar T743 SECTION 2 2 22 ...
Страница 48: ...SECTION 3 DESIGN AND OPERATION ...
Страница 80: ...SECTION 4 CORRECT USE ...
Страница 99: ...Pronar T743 SECTION 4 4 20 ...
Страница 100: ...SECTION 5 MAINTENANCE ...
Страница 119: ...Pronar T743 SECTION 5 5 20 FIGURE 5 6 Trailer lubrication points chassis ...
Страница 120: ...SECTION 5 Pronar T743 5 21 FIGURE 5 7 Trailer lubrication points vertical conveyor ...
Страница 147: ...Pronar T743 SECTION 5 5 48 ...
Страница 148: ...NOTES ...
Страница 149: ... ...
Страница 150: ...ANNEX A Tyre dimensions TRAILER VERSION FRONT MIDDLE REAR AXLE T743 700 50 26 5 16PR 1 1 wheel disc 24 x 26 5 ET 50 ...