SECTION 5
Pronar T743
5.3
FREQUENCY
OPERATION
NUMBER
DESCRIPTION
A
B
C
D
E
F
G
8
Cleaning the air filters
•
9
Checking hydraulic system tightness
•
•
10
checking lighting and signalling system
•
•
11
Checking nut and bolt tightness on wheels
and drawbar
See 5.2.12
12
Checking lubrication points
According to schedule
13
Checking technical condition of wheels
•
14
Adjustment of working pressure of clutch
See 5.2.14
15
Checking chain tightness of front chain
transmission (I stage)
See 5.2.15
16
Checking chain tightness of front chain
transmission (II stage)
See 5.2.16
17
Checking chain tightness of rear chain
transmission
See 5.2.17
18
Change oil in gear wheel transmission
After the first 50 hours of work
and then every 500 hours
19
Change oil in conveyor intersecting axis
gearing
After the first 50 hours of work
and then every 500 hours
Содержание T743
Страница 2: ......
Страница 6: ......
Страница 11: ......
Страница 12: ...SECTION 1 BASIC INFORMATION ...
Страница 25: ...Pronar T743 SECTION 1 1 14 ...
Страница 26: ...SECTION 2 SAFETY ADVICE ...
Страница 44: ...SECTION 2 Pronar T743 2 19 ITEM DECAL MEANING OF SYMBOL 15 Hydraulic clutch operation information decal ...
Страница 46: ...SECTION 2 Pronar T743 2 21 FIGURE 2 3 Locations of information and warning decals ...
Страница 47: ...Pronar T743 SECTION 2 2 22 ...
Страница 48: ...SECTION 3 DESIGN AND OPERATION ...
Страница 80: ...SECTION 4 CORRECT USE ...
Страница 99: ...Pronar T743 SECTION 4 4 20 ...
Страница 100: ...SECTION 5 MAINTENANCE ...
Страница 119: ...Pronar T743 SECTION 5 5 20 FIGURE 5 6 Trailer lubrication points chassis ...
Страница 120: ...SECTION 5 Pronar T743 5 21 FIGURE 5 7 Trailer lubrication points vertical conveyor ...
Страница 147: ...Pronar T743 SECTION 5 5 48 ...
Страница 148: ...NOTES ...
Страница 149: ... ...
Страница 150: ...ANNEX A Tyre dimensions TRAILER VERSION FRONT MIDDLE REAR AXLE T743 700 50 26 5 16PR 1 1 wheel disc 24 x 26 5 ET 50 ...