2. Secure the screw.
2.5” sAtA hdd/ssd c
Age
Reminder
Before you remove or install the 2.5” SATA HDD/SSD Cage, follow the steps
below:
1. Make sure the server is not turned on or connected to AC power.
2. Remove the motherboard assembly. To remove the motherboard
assembly, see “To remove the motherboard assembly” on page 30.
3. Remove the 2.5” SATA HDD/SSDs. To remove the 2.5” SATA HDD/SSDs,
see “2.5” SATA HDD/SSDs” on page 26.
4. Disconnect all necessary cables.
Securing the Screw
32
VSky H3970 Product Manual
Promise Technology, Inc.
Содержание VSky H3970hDM
Страница 5: ...v Product Manual About ...
Страница 63: ...CPU Configuration 50 VSky H3970 Product Manual Promise Technology Inc ...
Страница 65: ...Socket 0 CPU Configuration 52 VSky H3970 Product Manual Promise Technology Inc ...
Страница 66: ...CPU Power Management Configuration 53 Product Manual BIOS Setup ...
Страница 71: ...USB Configuration 58 VSky H3970 Product Manual Promise Technology Inc ...
Страница 75: ...Super IO Configuration 62 VSky H3970 Product Manual Promise Technology Inc ...
Страница 78: ...ME Subsystem 65 Product Manual BIOS Setup ...
Страница 79: ...Memory Configuration 66 VSky H3970 Product Manual Promise Technology Inc ...
Страница 81: ...DIMM Information 68 VSky H3970 Product Manual Promise Technology Inc ...
Страница 84: ...Console Redirection Settings 71 Product Manual BIOS Setup ...
Страница 87: ...Boot Menu 74 VSky H3970 Product Manual Promise Technology Inc ...
Страница 91: ...Server Management Menu 78 VSky H3970 Product Manual Promise Technology Inc ...
Страница 94: ...View FRU Information 81 Product Manual BIOS Setup ...
Страница 121: ...Appendix C China RoHS Regulations China RoHS Regulations 108 VSky H3970 Product Manual Promise Technology Inc ...