7
3
3. While another person lifts the front of the Frame
(1), attach the Front Stabilizer (2) to the Frame
with two M10 x 78mm Button Screws (67) and
two M10 Split Washers (34).
1
2
34
67
4
4. While another person holds the Upright (3) near
the Frame (1), connect the Upper Wire Harness
(32) to the Lower Wire Harness (31).
Gently pull the upper end of the Upper Wire
Harness (32) to remove the slack, and slide the
Upright (3) onto the Frame (1).
Tip: Avoid pinching the wire harnesses.
Attach the Upright (3) with four M8 x 20mm
Patch Screws (35) and four M8 Split Washers
(36).
35
35
36
36
36
32
31
36
3
1
Avoid pinching the
wire harnesses