Phase Sequence
Delay
This setting determines if the engine shall
be started and load switch to generator in
case of reverse phase sequence of mains.
Disabled Disabled*
1-10 Sec
Mains
Restoration Time
The time for which Mains should be
continuously healthy before stopping the
Generator and load transferred to Mains.
10
1-100 Sec
Warm Up Time Generator is allowed to run idle(warm up)
for this duration before the load is
connected.
0
0-100 Sec
Mains Over
Load
DGC202X can protect contactors from
mains overload. If this setting is enabled
then the mains contactor shall drop after
the mains current crosses the set limit for a
programmed duration.
2
2-9999
Disabled*
Mains Over
Load Delay
The monitoring duration for the above
parameter before the fault is triggered.
5
1-100 Sec
Mains Fail
Some application requires the generator to
start on failure of one or more phases
Other wants all the 3 phases to become
unhealthy before starting the generator
DGC can handle both situations.
Any Phase
Fail
Any Phase
Fail
R phase Fail
GCB to MCB
Delay
User programmable delay when the load is
transferred from Generator to Mains.
2
1-10 Sec
Recooling Time The time for which generator is allowed to
run on no load(cool down) before switching
off.
30
0-100 Sec
Manual: Auto
Stop
In manual mode, though the generator
shall be started manually, its stopping could
either be manual or automatic. If enabled
the generator can be automatically shut
down once the mains voltage
becomeshealthy.
Enabled Enabled
Disabled*