Safety
12 / 43
51500024
V2
GB
It is forbidden for persons to ride on the laying machine (by hanging on from the outside)!
Accident/life hazard!
•
It is generally forbidden for persons to stand in the working and travel area of the installation
machine during installation work.
A minimum safety distance of 1.5 m between the person and the machine must be observed!
Exception: It is essential due to the type of use of the implement, e.g. by manually guiding a implement
at the handles.
•
It is generally forbidden to stand under a suspended load!
•
It is strictly forbidden to stand in the steering area/kink area of the machine! Risk of crushing the
feet/legs between the front wheels and the chassis.
•
The driver must not leave the control position if the attachments of the laying machine are loaded
with laying material and the system is in operation.
•
Never let
the control lever valve (joystick) for operating the attachments, the control pedal for forward
and reverse travel or the control pedal for up and down movement of the boom
spring back
.
Otherwise there will be pressure surges in the forward and return lines! The laying material may fall
down and the hydraulic motors may be
damaged
!
2.8.4
Stability
Danger of overturning!
Only drive at walking speed and with the boom lowered (with and without load) if the following applies:
•
No attachment equipment (e.g. HVZ-UNI) mounted on boom
•
Driving curves
•
Driving in
unpaved and uneven terrain
•
Terrain with
slope
•
Machine
slope
of more than 10° (~ 18 %)
Driving faster than step speed allowed if the following applies:
•
Drive straight ahead (with and without attachment equipment and stone position)
•
Driving in paved and level terrain
•
Check terrain in advance for
sufficient surface condition
(such as large holes or broken ground).
•
When using the laying machine on roofs, parking decks or other soft ground, the
load capacity of the
ground must be checked in advance.
•
In the event of accidents or when the laying machine tilts over, load-bearing parts must be inspected by
a specialist workshop before the machine is put back into operation.
Содержание VM-301-KJ-GREENLINE
Страница 16: ...General 15 43 51500024 V2 GB 3 2 Survey and construction...
Страница 41: ...Maintenance and care 40 43 51500024 V2 GB 7 2 Lubrication plan...
Страница 42: ...Maintenance and care 41 43 51500024 V2 GB...
Страница 45: ......
Страница 47: ......
Страница 69: ......