background image

Operating 

HVZ-uni 

V7 

 

18/06/12 

30 / 36 

 

 

 

HINT:

 

If the packages are bad or instable, usually caused by bad pallets, paving stones at the side rows 
could fall over or fall down while shifting the paving layer direct on the package. In this case lift 

the paving layer without shifting, set it down on a suitable ground and shift it there. 

HINT: 

If the gripping quality is not good enough (layer is tending to break or paving stones in side rows 
tend to fall over) keep the side clamp closed until you reach the laying position and open it a short 

time before you lay it down. 

HINT: 

Don not try to „tip“ the paving layers in side clamping direction with the already laid paving stones. 
This is not possible, because the paving layers in the clamp are compressed and the already laid 

paving stones are unconsolidated. It is better to either remove the “key-stones” before laying and 

later bring it back or lay additional paving stones after the complete laying process. 

 

 

Before lifting the paving layer with the support vehicle, move the support point 5-10 cm in direction of 
the laying side main gripper either using the boom (excavator) or driving the installation machine. 

Afterwards the paving layer can be lifted vertically. 

 

Transport the paving layer to the laying position swinging the boom (excavator) or driving the 

installation machine. 

 

Place the paving layer 5 cm in direction to the open laying ground until the rollers touch the already 

laid paving stones. 

 

Move the paving layer diagonally to the corner of the laying edge and take care of the correct 

connection to the already laid paving stones. 

 

Set the paving layer down until the support chains sag lightly.  

 

Open the main grippers for 2 seconds. At first the hydraulic cylinder of the pushing off device will 
retract and the first row of paving stones will obtain the accumulated elastic force. The opening 

sequence of the main clamp happens after the complete extension of the ADV cylinder and the paving 

layer is laid in the grade. The paving stones are pressed down from the ADV bar. 

 

Move the support point 5-10 cm in direction of the facing bedding sand side main clamp. 

 

When you lift the HVZ uni it will swing automatically in direction of the facing bedding sand (facing 
bedding sand side main clamp), away from the already laid paving stones. So it is possible to lift the 

HVZ uni without removing paving stones of the front row. 

 

Open the main clamp completely and close it immediately for 1 seconds while moving the installation 

machine to the next paving layer. The closing sequence of the main clamp causes the hydraulic 

cylinder of the ADV to extend and the spring pack is loaded. 

 

The installation clamp HVZ is ready for the next laying cycle. 

7.4

 

General hints for laying according to standards 

After the laying process is done it is necessary to move the new laid paving stones a little bit in direction of 
the facing bedding sand (the best way for the operating personal is to use his feet). This is the only way to 

achieve a standard joint (3 – 5 mm).  If it is necessary to start with manual laying before you can use the 
installation clamp, take care that the grid system of the paving layers is correct. Do not manipulate the joints 

with the rubber hammer, because the result will be a non-standard paving area. 

 

Содержание 51400017

Страница 1: ...Hydraulic Installation Clamp HVZ uni 004 Order No 51400017 Serial No Hydraulic Installation Clamp HVZ uni V7 Translation of original operating instructions...

Страница 2: ...t prevention 9 4 4 Function Control 9 4 4 1 General 9 4 4 2 Hydraulic 10 4 5 Safety procedures 10 4 5 1 Hydraulic excavator and other lifting equipment 10 4 5 2 Safety at installation work 10 4 5 3 Ch...

Страница 3: ...e paver installation complying with the standards 28 7 3 Operating procedure of laying cycle 29 7 4 General hints for laying according to standards 30 7 5 General laying hints 31 8 Maintenance and car...

Страница 4: ...no conformi alla macchina EG linea di Guida CE 2006 42 EG Cumple con las siguientes provisiones aplicables a Directrices de la CE 2006 42 EG Fundstellen der harmonisierten Normen Applied harmonized st...

Страница 5: ...istances to prevent hazard zones being reached by upper and lower limbs S curit des machines Distances de s curit emp chant les membres sup rieurs et inf rieurs d atteindre les zones dangereuses Sicur...

Страница 6: ...avers in good quality are allowed for laying Pavers with feet bellies and blind spacers are not allowed because the complete bricklayer could fall out of the device The device is equipped with Adjusta...

Страница 7: ...tting Q Operator handle Suspension Main clamping direction Rollers Steel Lamellas Setting L Side clamping direction Setting P Hydraulic cylinder Main clamping direction Readjustment guidance X1 Pushin...

Страница 8: ...will result 3 5 Definition skilled worker specialist Only skilled workers or specialists is it allowed to carry out the installation maintenance and repair work on these device Skilled workers or spe...

Страница 9: ...ally children The workplace have to be sufficiently illuminated The working with the device in case of atmospheric editions under 37 5 F is forbidden Because the goods could be fall down caused by dam...

Страница 10: ...allation work Prohibition Danger Prohibition The manual guiding of is only allowed for devices with handles While using the device be sure that there are no persons in the working area Life danger The...

Страница 11: ...blocks in main gripper direction have to face the ground If the tower is falling the blocks can fall out of the cube moving grab STAZ If the tower is standing the gripping quality is OK Blocks have f...

Страница 12: ...rate hydraulic circuit are required to connect the HVZ uni to the equipment used to operate the HVZ uni excavator wheelloader eg The hydraulic tubes are connected to the valve block The max pressure f...

Страница 13: ...portant for the operator to read carefully the following points of explanation an instruction in order to get the maximum benefit from this very versatile device Attention Take care that nobody is in...

Страница 14: ...cylinder retaining pin main clamp direction facing bedding sand I Positionadjustment gripping depth facing bedding sand N Gripperlength main clamp direction optional E Position centering chain facing...

Страница 15: ...lers A Position cylinder retaining pin Main clamp direction laying side D Position adjusting chain laying side W2 Power down pressure hydraulics main clamp direction open W1 Switch on pressure hydraul...

Страница 16: ...uni Opening width in mm Adjustments OW min in mm OW max in mm 600 A1 B6 D0 E0 F4 I1 570 770 650 A1 B6 D0 E1 F4 I1 570 770 700 A1 B5 D1 E4 F6 I2 630 830 750 A2 B5 D2 E5 F7 I3 680 880 800 A3 B5 D3 E6 F...

Страница 17: ...g gripping depth facing bedding sand Setting I Positionsetting gripping depth facing bedding sand Step by step Check the measurement of pack The measurement of the pack in direction of the main grippe...

Страница 18: ...ce to them 6 2 2 Adjusting the gripping depth Adjusting the gripping depth laying side G Adjust the gripping depth on laying side by turning the handles G so that the steel lamellas are gripping the p...

Страница 19: ...en the self locking nuts tight and then loosen them again by 1 2 turn In order to give the steel lamellas a higher flexibility and therefore a good secure and gentle grip to the pavers Recommendation...

Страница 20: ...a wall is not stitching over any more when fitting the steel lamellas exactly up to the end Special gripper holders N It is recommended to have a second pair of main gripper holders for example 1 m l...

Страница 21: ...llas a higher flexibility and therefore a good secure and gentle grip to the pavers 6 2 4 Adjustment side gripping direction Gripper length side gripping direction R Check the measurement of the depth...

Страница 22: ...ger than the actual length of the laying cluster Doing this you make sure that the single pavers are not compressed together completely but still have small joints between one another in the side clam...

Страница 23: ...ck of pavers clamp hanging freely Close side clamp completely Hanging height should be high enough so the side clamp is not touching the pavers Rough setting of both side clamping parts via screw P un...

Страница 24: ...ween the steel lamellas and the pavers of about 1 cm the heads of the positioning adapters will hit the pavers in the middle Tighten the screws of the positioning adapters in the right position Make s...

Страница 25: ...e clamp just before laying the pavers down Lift up HVZ uni slowly If the gripped layer bends down in the middle too much stop the first gripping trial Due to the poor quality in regard to the gripping...

Страница 26: ...n the joint between the already laid pavers and the gripped layer 6 5 Annotations to the pushing of device The patented pushing off device avoids the cocking of the pavers and thus an uncontrollable d...

Страница 27: ...and the layer falls down DANGER OF ACCIDENTS Move the operating lever slowly and carefully almost at idling speed because the great hydraulic flows of big excavators can cause malfunctions or even dam...

Страница 28: ...t the upper edge of the pavers After the installation process these additional but slight joint space mustn t be hammered together with a rubber hammer in bedding sand direction not at all After the i...

Страница 29: ...een the HVZ and the support vehicle use the function of the rotator to adjust the clamp to the layer For the precise adjustment use the slope of the clamp to align the steel lamellas of the laying sid...

Страница 30: ...he correct connection to the already laid paving stones Set the paving layer down until the support chains sag lightly Open the main grippers for 2 seconds At first the hydraulic cylinder of the pushi...

Страница 31: ...f the paving layers Contact your paving stone supplier for laying information and do not waste time with experiments If there is a separation between an old manual laying to the laying with the instal...

Страница 32: ...After 50 operating hours Tighten all screws and connection Take care that the tightening torques according to the property class of the screws are observed Check all joints bolts guidance s and gears...

Страница 33: ...ead joints and connection The implementation is only allowed by an expert After 50 operating hours Tighten all hydraulic connections Check the hydraulic system for leaks Check the hydraulic oil filter...

Страница 34: ...bing noise is still audible repeat point 1 to 3 When closing the main clamp Adjustment with 1 down 1 Open lock nut A with fixed spanner 2 Open Allen screw B with Allen key one turn counter clockwise 3...

Страница 35: ...s of max 1 year and all recognized errors are removed see BGR 500 The corresponding regulations of the declaration of conformity have to be observed We recommend that after checking the device the bad...

Страница 36: ...hich can be handled with the device Do not exceed this carrying capacity If you use the device in combination with other lifting equipment Crane chain hoist forklift truck excavator consider the deadw...

Страница 37: ...0001 21550058 41400285 36450011 33500624 41500346 31060006 30300004 30320093 30320094 34010046 20000075 20000276 20400073 20100017 20000025 21720001 20100061 20000024 20020068 20140005 20530006 204000...

Страница 38: ...migung Gewicht Bei nderungungen R cksprache TB Kunde WA mit niedriger Einbauh he 1 Rolf Ganitz 27 6 2005 Gepr Erst Name Datum von Blatt Ers d Ers f Urspr Zust E41500354 Artikelnummer Zeichnungsnummer...

Страница 39: ......

Страница 40: ......

Страница 41: ......

Страница 42: ...lic Hoses Hydraulic Installation Clamp HVZ uni Datum 30 07 03 nderungsdatum 30 09 03 Name Holderied Art Nr 22000322 Art Nr 22000082_ Art Nr 22000068_ Art Nr 22000321_ Art Nr 22000328_ _Art Nr 22000323...

Страница 43: ...iste a Profilgummi 40x30 f r Fischgr t Adapter 34010067 F hrungsschiene Halfen HM38x17 f r verstellb Fu zu Fischgr tadapter 41400332 Halter zu verstellb Fu f r Fischgr tadapter 41400116 Verstellbarer...

Страница 44: ......

Страница 45: ...bi nation mit ____ ______ ______ ____________ ___________________________________________ ____________ ______________ ___________________________ KK 3 1 22040015 Ventilblock Typ 26 1 0014 000 hydr 1 S...

Страница 46: ...St A3C ____ ______ ______ ____________ ___________________________________________ ____________ ______________ ___________________________ KC 16 1 22140085 Einstellbare L Versc hraubung 15 3 290 1 St...

Страница 47: ...und Robogrip verz ____ ______ ______ ____________ ___________________________________________ ____________ ______________ ___________________________ KK 24 1 32200021 HD Zylinder So 60 25 200 Hub 1 S...

Страница 48: ...___ ____________ ___________________________________________ ____________ ______________ ___________________________ KK 50 1 22000329 HD Schlauch 2SC Poly NW 08 x 640 1 St DKOL 10 90 DKOL 10 90 90 ged...

Страница 49: ...www probst gmbh de Operator _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Device type _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Article No _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Device No _ _ _ _ _ _ _ _ _ _ _ _ Year of make _ _ _...

Страница 50: ...www probst gmbh de Operator _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Device type _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Article No _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Device No _ _ _ _ _ _ _ _ _ _ _ _ Year of make _ _ _...

Страница 51: ...www probst gmbh de Operator _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Device type _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Article No _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Device No _ _ _ _ _ _ _ _ _ _ _ _ Year of make _ _ _...

Отзывы: