Table of Contents |
III
1
Preface
Th
is manual is intended to be used in conjunction with
Pro Refrigeration, Inc Chiller Systems
Th
is manual will guide you through the process of install-
ing, commissioning, and maintaining your Pro Chiller
System.
Receiving & Unloading
Before signing the Bill of Lading please complete the
following:
•Check Service Panels for Damage
•Confi rm positive pressure on refrigerant pressure gauges.
•Remove from service panels and visually inspect all pip-
ing for broken and or cracked lines.
Please note any obvious, or potential damage on bill of
lading prior to signing. Contact Pro Refrigeration, Inc
immediately 800-845-7781 to report any damage.
Manufactured By:
Pro Refrigeration, Inc.
Pro Refrigeration is located in Auburn WA. Auburn is
located 30 miles from Seattle, WA in the shadow of Mt.
Rainier.
Physical Address:
326 8th ST SW
Auburn, WA 98001
www.prochiller.com
Mailing Address:
PO BOX 1528
Auburn, WA 98071-1528
Telephone:
253-735-9466
Fax:
253-735-2631
Customer Service
Please feel free to contact customer service with any
questions pertaining to this or any other Pro Refrigera-
tion, Inc product.
Customer Support Hours:
Monday-Friday
7am-5pm (Pacifi c Standard Time)
Telephone:
253-735-9466
Fax:
253-735-2631
Email:
Warnings & Cautions:
Th
roughout this manual warnings & cautions will be
issued containing pertenant information regarding the
safety of you and/or your equipment. Th
ese messages
will be accompanied by the following symbols:
Warning
Caution
Содержание CHILSTAR Series
Страница 1: ...Operations Manual...
Страница 7: ...Packaged Glycol Chiller Systems 5 3ST Series Pump Curve 5SH Series Pump Curve...
Страница 24: ...Packaged Glycol Chiller Systems V NOTES...