Packaged Glycol Chiller Systems |
9
CHILSTAR & MA SERIES CHILLER QUICK START GUIDE
Th
e quick start guide is designed to be used in conjunction with a Pro Chiller System. As such, this guide as-
sumes that all that all electrical and mechanical devices are in the condition provided by the factory.
STEP 1
Adequate clearance is required around the unit to provide air fl ow. Ideally you want at least 48” clearance around
all four sides of the system. Chiller systems located indoors require adequate ventilation to insure effi
cient opera-
tion. Contact the Factory with any questions about chiller location and placement.
Power must be supplied to chiller electrical panel. Check your local electrical codes, it is likely an
electrical disconnect/safety switch will need to be located near the chiller system. Check name plate or
manual for electrical power supply requirements.
STEP 2
Open Electr
ical Panel and make sure all electrical connections are tight. Th
ese connections may loosen during
shipment. Loose connections can cause motor failures.
CAUTION
Refrigeration ball valves are
shipped from the factory in the closed posi-
tion. Prior to operation adjust valves to the
open position.
WARNING
Verify that all external power
sources have been removed before servicing
WARNING
Do not turn on main power to
the chiller system until all of the electrical
connections are confi rmed to be tight.
Please use the services of a licensed and skilled
refrigeration technician for chillerstart-up.
Contact Pro Technical Services with any
questions or concerns at
800-845-7781
Содержание CHILSTAR Series
Страница 1: ...Operations Manual...
Страница 7: ...Packaged Glycol Chiller Systems 5 3ST Series Pump Curve 5SH Series Pump Curve...
Страница 24: ...Packaged Glycol Chiller Systems V NOTES...