10
| Pro Refrigeration, Inc
STEP 3
Remove Front and Side Service Panels as applicable.
Open both of the glycol Valves by turning the handles counter
clockwise.
STEP 4
If a tank is installed on your Pro Chiller System fi ll it with water (no glycol at this time). Otherwise locate the
remote tank or water source and prepare the system to fl ush the piping with water.
Visually check for any leaks on the system before proceeding.
STEP 5
Turn each circuit’s STAGE switch to the ON position. If your chiller is a single circuit system turn the CHILL-
ER switch to the ON position
Your pump will energize and begin circulating water throughout the piping loop. Open all of the solenoids or
heat exchangers on the loop to get a complete system fl ush. Visually inspect all of your piping for leaks and repair
prior to proceeding.
Single Circuit Chiller System
Dual Circuit Chiller System
Содержание CHILSTAR Series
Страница 1: ...Operations Manual...
Страница 7: ...Packaged Glycol Chiller Systems 5 3ST Series Pump Curve 5SH Series Pump Curve...
Страница 24: ...Packaged Glycol Chiller Systems V NOTES...