Setting up the PTBurn Server 17
you to enable or disable the Admin Notifications and you will see a
drop down list allowing you to select the workstation that will receive
these messages.
B.3. Job Handling Settings
This section identifies how the Server will handle queued jobs and
report their status.
Job Handling Settings
The
Complete all copies…
setting will allow you to decide whether
failed discs will be counted towards completing a requested job. For
instance, a client requests 5 copies in a job request. When the server
processes the job, 4 discs are successful, and 1 fails. If this option is
disabled, the job will
be completed as is, with 4 good discs and 1 failure. If this is enabled,
the server will record another disc to complete the
job request.
How Long before lower priority jobs get 'Promoted'
will identify jobs
that have been waiting for a set time and change the priority to allow
them to be completed faster. Priority is set in the client application
(see section 5F Using PTBurn Client's 'Get Status' Window) and
assigned a number from 0 to 5 (0 being the highest, 5 being the lowest)
allowing certain jobs to be able to skip ahead in the queue if they are
more urgent.
Содержание 510869
Страница 1: ...PTBurn Network Software User s Manual 2003 All rights reserved...
Страница 24: ...20 Setting up the PTBurn Server ection 4 Installation and Setup of...
Страница 71: ...Index 67 System Requirements Client 3 System Requirements Server 3 Verify 50...
Страница 72: ...Printed in the United States of America P N 510869...