PRE-INSTALLATION INSTRUCTIONS AND CHECKLIST

Read and Save These Instructions

Warning 

• 

To reduce the risk of fire, electrical shock, or injury to persons, observe the following:

• 

Installation work and electrical wiring must be done by a qualified person(s) in accordance with all applicable codes 

and standards, including fire-rated construction. 

• 

Unit must be used in supply applications only, and access above the ceiling is required.

Before you start

• 

Inspect all cartons and boxes for flaws and shipping damage.

• 

If anything is found to be damaged, contact the shipping company and file a freight claim. 

• 

Review Price project specific submittals to ensure booms are located in the correct locations (recommended to measure  

and chalk outline of ceiling system on floor).

• 

If drywall perimeter is installed prior to the system, ensure that the opening is cut to the correct dimensions (as per the  

submittal), and is square on all corners.

• 

Ensure all tools (as listed below) are on site and ready for use.

• 

A minimum of two (2) people will be required to install this system.

Required Tools/Parts

• 

To be supplied by contractor.

• 

(2+) 8 ft. ladders or scaffolding

• 

Laser level

• 

Cordless drill/impact

• 

#8 self-tapping screws (1/2 in. maximum length)

• 

Screwdriver bit(s) to suit self-tapping screws

• 

Allen keys (5/32 in. and 3/16 in.)

• 

Damp cloth(s) (for cleaning)

• 

Utility knife

• 

Chalk line

• 

Pliers with wire cutter

• 

Tape measure

• 

Clamps/locking plier

• 

Pre-stressed 12 gauge suspension wire (or approved alternative) with necessary equipment to hang wire

• 

Supplied by Price:

• 

Job specific submittal drawing showing all sizes and dimensions of module assembly sections

• 

Luminaire module sub-assembly sections (refer to job submittal drawing for quantity and sizes)

• 

Remote driver cabinets (refer to job specific submittal drawing for quantity, sizes and field wiring connection details)

• 

Dimmer switches (refer to job specific submittal drawing for quantity and field wiring connections)

• 

HGWC Perimeter ceiling sections (if applicable)

• 

1/32 in. x 3/4 in. (t x w) white gasket tape – for between modules (Part Number 042373 004)

• 

The following supplied for bolting module assemblies together:

• 

Bolt

• 

Metal washer

• 

Lock nut assembly

Содержание ULTRASUITE ARRAY

Страница 1: ...MANUAL INSTALLATION ULTRASUITE ARRAY Operating Room Diffuser System with LED Lighting v100 Issue Date 09 07 18 2018 Price Industries Limited All rights reserved...

Страница 2: ...LE OF CONTENTS Product Overview 1 Pre installation Instructions and Checklist 2 Installation Instructions Luminaire Mounting and Installation 3 Remote Driver Cabinet Mounting and Installation 9 Electr...

Страница 3: ...and alone module fig 1 or An array of module assemblies fig 2 2 The luminaire s will come with a remote LED driver cabinet with pre wired driver connections fig 3 The quantity of drivers varies with t...

Страница 4: ...sted below are on site and ready for use A minimum of two 2 people will be required to install this system Required Tools Parts To be supplied by contractor 2 8 ft ladders or scaffolding Laser level C...

Страница 5: ...face is clean and free of debris that could damage the product finish NOTE Ensure that adjacent module assembly sections have mated inlets in the correct locations fig 4 Step 3 Attach lengths of pre s...

Страница 6: ...using a 5 32 in Allen key removing the countersunk flat head screw fig 6 Step 6 Using a 3 16 in Allen key unscrew the damper mounting screw to release the aperture plate damper for access to the plen...

Страница 7: ...5 priceindustries com ULTRASUITE ARRAY Manual ULTRASUITE ARRAY INSTALLATION INSTRUCTIONS FIGURE 9 APERTURE PLATE DAMPER REMOVAL FIGURE 10 OPEN PLENUM WITH FACE AND APERTURE DAMPER REMOVED...

Страница 8: ...the system once all modules are in place fig 11 Step 9 Raise adjacent module assemblies temporarily supporting the modules with hanger wire Fasten modules together using bolts metal washers and lock...

Страница 9: ...ystem or drywall if installed applicable and or at the correct height and that there is no slack in the hanger wires NOTE Perimeter drywall must be installed slightly above the height of the rest of t...

Страница 10: ...for airflow adjustment Closed full left or full right position Open center position FIGURE 17 DAMPER APERTURE PLATE ADJUSTMENT FIGURE 18 GASKET INSTALLATION CROSS SECTION ALL METRIC DIMENSIONS ARE SOF...

Страница 11: ...ire to the remote driver cabinet Refer to page 3 for luminaire mounting and installation and page 11 for electrical connections Step 3 Mount remote driver cabinet s to the wall using the six mounting...

Страница 12: ...ng into wall or ceiling do not damage electrical wiring and other hidden utilities Step 1 Remove enclosure box cover Four screws 20 x in Hex Head Step 2 Wire the high voltage side of each remote drive...

Страница 13: ...L BLOCK LVTB LOW VOLT TERMINAL BLOCK 001 1 DRIVER DASH NO DESCRIPTION LINE LEGEND FACTORY ELECTRICAL WIRING FIELD ELECTRICAL WIRING WIRE GAGE LENGTH FT 18 AWG 15 FT 16 AWG 25 FT 14 AWG 45 FT 12 AWG 70...

Страница 14: ...D CONNECTION SUPPLY 2 USE COPPER 80 C MIN RATED PLENUM RATED WIRE FOR LOW VOLTAGE FIELD CONNECTION SEE TABLE BELOW FOR RECOMMENDED WIRE GAGE AND LENGTHS HVTB LVTB Initials Completion date Factory orde...

Страница 15: ...NNECTION SUPPLY 2 USE COPPER 80 C MIN RATED PLENUM RATED WIRE FOR LOW VOLTAGE FIELD CONNECTION SEE TABLE BELOW FOR RECOMMENDED WIRE GAGE AND LENGTHS HVTB LVTB LVTB Initials Completion date Factory ord...

Страница 16: ...NECTION SUPPLY 2 USE COPPER 80 C MIN RATED PLENUM RATED WIRE FOR LOW VOLTAGE FIELD CONNECTION SEE TABLE BELOW FOR RECOMMENDED WIRE GAGE AND LENGTHS HVTB LVTB LVTB Initials Completion date Factory orde...

Страница 17: ...ON SUPPLY 2 USE COPPER 80 C MIN RATED PLENUM RATED WIRE FOR LOW VOLTAGE FIELD CONNECTION SEE TABLE BELOW FOR RECOMMENDED WIRE GAGE AND LENGTHS HVTB LVTB LVTB LVTB Initials Completion date Factory orde...

Страница 18: ...ON SUPPLY 2 USE COPPER 80 C MIN RATED PLENUM RATED WIRE FOR LOW VOLTAGE FIELD CONNECTION SEE TABLE BELOW FOR RECOMMENDED WIRE GAGE AND LENGTHS HVTB LVTB LVTB LVTB Initials Completion date Factory orde...

Страница 19: ...17 priceindustries com ULTRASUITE ARRAY Manual ULTRASUITE ARRAY NOTES...

Страница 20: ...s document contains the most current product information as of this printing For the most up to date product information please go to priceindustries com 2018 Price Industries Limited All rights reser...

Отзывы: