INSTALLATION INSTRUCTIONS
Step 14:
Connect ductwork and balance the Ultrasuite system inlet accordingly.
NOTE:
If minor airflow adjustments are required, adjust damper by loosening and sliding the screw with a 3/16 in. Allen key (fig. 17).
Step 15:
Re-install face and secure in place by tightening countersunk screws.
Step 16:
If perimeter welded ceiling grid (HGWC) is being used; apply gasket (Part Number 042373-004) to one outside (vertical)
surface of the half tee where two modules meet. The gasket is supplied in 50ft rolls – measure and cut the gasket as required.
NOTE:
Gasket should be installed as close to the top of the tee as possible – do not extend past the top of the tee. Ensure that only
one half tee has the gasket applied. Do not stretch gasket as it is being applied, as this will cause it to pull away from the tee over
time (fig. 18).
Step 17:
Screw half tees to the perimeter Ultrasuite module referencing the diagram below module (fig. 19).
Slide damper aperture
plate for airflow adjustment
Closed: full left or full right
position
Open: center position
FIGURE 17: DAMPER APERTURE PLATE ADJUSTMENT
FIGURE 18: GASKET INSTALLATION CROSS SECTION
OF
ALL METRIC DIMENSIONS ( ) ARE SOFT CONVERTED. IMPERIAL DIMENSIONS ARE CONVERTED TO METRIC AND ROUNDED TO THE NEAREST MILLIMETER.
SHEET 7
7
269854
PROJECT:
ENGINEER:
CUSTOMER:
SUBMITTAL DATE:
REVISION: 0
©
Copyright PRICE INDUSTRIES 2018
Submittal Sheet
2018/04/27
ULTRASUITE
OPERATING ROOM DIFFUSER SYSTEM WITH INTEGRATED LED LIGHTING
USA
ULTRASUITE ARRAY
OPERATING ROOM
DIFFUSER SYSTEM
WITH INTEGRATED
LED LIGHTING
DS
HALF TEE
FASTENING DONE IN FIELD
WITH SELF-TAPPING SCREWS
#8 X .500 MAX
PROVIDED BY OTHERS
CLOSED CELL POLYETHYLENE GASKET
(.031" X .750" THK UNCOMPRESSED)
APPLIED BETWEEN TEES IN FIELD
BOLTED JOINT ASSEMBLY
OPENING CUTOUT FOR
AIR TO PASS BETWEEN
PLENUMS
1/4-20 X 3/4 SS BOLT
1/4" SS FLAT WASHER
1/4-20 JAM NUT
1.500
FULL TEE
PERIMETER SHEETROCK
SOFFIT BY OTHERS
FULL TEES FACTORY PRE PUNCHED
EVERY 6" ON CENTER FOR HANGER
WIRES (SUPPLIED BY OTHERS)
1.500
1.563
CLOSED CELL POLYETHYLENE GASKET
(.125" X .500" THK UNCOMPRESSED)
SHIPPED LOOSE AND FIELD
APPLIED ON ALL TEES
1.563
ULTRASUITE
SELF-TAPPING SCREWS
#8-1/2" MAX
PROVIDED BY OTHERS
DRYWALL
(BY OTHERS)
ULTRASUITE
SELF-TAPPING SCREWS
#8-1/2" MAX
PROVIDED BY OTHERS
CEILING
PANEL
A
-
HALF TEE FIELD JOINT
B
-
FULL TEE PERIMETER
SHEET ROCK SOFFIT
C
-
HGWC LOOSE
HALF TEE
D
-
E
-
HGWC GRID
SECTION
HGWC INTEGRATION DETAILS
PERIMETER HALF TEE INTEGRATION
HGWC GRID INTEGRATION
FIGURE 19: PERIMETER HELF TEE INTEGRATION