21
SeCTION 3
OPeRATION
3.0 OPeRATION
To ensure that the Prest-O-lite 380 operates correctly please perform the
following steps:
1. Turn on main power switch and make sure air is flowing to the machine. Adjust
the air regulator to 65 psi before cutting operations begin.
NOTe:
This pressure adjustment must be made within 15 seconds after the machine is
turned on. If this is not done within the allotted time the main power must be
turned off and back on again to activate the 15 second preflow sequence for air
pressure adjustment.
2. Set output current from 15 to 30 amperes to suit cutting conditions prior to
operation of the machine. See Page 25.
Содержание 380
Страница 4: ... TABLE OF CONTENTS ...
Страница 14: ...14 SECTION 1 DESCRIPTION ...
Страница 26: ...26 SECTION 3 OPERATION ...
Страница 30: ...30 SECTION 4 MAINTENANCE WORK LEAD CONNECTION TORCH CONNECTION ...
Страница 41: ...41 Notes ...
Страница 42: ...Notes ...
Страница 43: ...Revision History Original release 06 2006 03 2007 Revised Title Page layout text ...