21
19
18
20
B
E
F
I
24
STEP 12
a) Open the left top lid first,
and align the holes on
24
motor support with the holes
on the side panel of body
assembly as shown.
b) Insert
B
one bolt from the
inside of the motor support
into each hole on the side
panel of the body assembly.
Place
E
one washer and
F
one spring washer and
I
one nut on the bolts from
the opposite side of the side
panel of the body assembly.
Tighten by hand.
c) Go back to tighten all the bolts
using screwdriver provided.
STEP 13
a) Place
18
five flame tamers
inside the body assembly
over the burners.
b) Place
19
three cooking
grids inside the body
assembly over the
flame tamers.
c) Place the
21
warming grid
onto the warming grid
support as shown.
d) Open the top right lid.
e) Place the
20
searing grid
inside the body assembly
over the infrared burner.
22
Содержание PC25774
Страница 43: ...43 NOTES AND OBSERVATIONS ...