
Be sure to use a torque wrench to tighten the service port cap to a torque 18N.m.
Be sure to check the gas leakage.
5.7 Re-installation while the outdoor unit need to be repaired
1. Evacuation for
the whole system
Procedure:
1).
Confirm that both the 2-way and 3-way valves are set to the opened position.
2). Connect the vacuum pump to 3-
way valve’s service port.
3). Evacuation for approximately one hour. Confirm that the compound meter indicates -0.1Mpa.
4). Close the valve (Low side) on the charge set, turn off the vacuum pump, and confirm that the gauge
needle does not move (approximately 5 minutes after turning off the vacuum pump).
5). Disconnect the charge hose from the vacuum pump.
Содержание PAC1203711
Страница 1: ...Service Manual PAC1203711 PAC1803711 PAC2403711 ...
Страница 9: ...Model L mm R mm H mm Dimension of installation hole mm PAC1203711 100 95 45 65 PAC1803711 110 100 45 ...
Страница 10: ...Model L mm R mm H mm Dimension of installation hole mm PAC2403711 293 163 45 65 H L R ...
Страница 24: ...Use torque wrench to tighten the service port cap to a torque of 18N m Be sure to check for gas leakage ...