
Two people are recommended for this step: one
person to level the wall plate and another person to
mark the mounting locations.
Concrete Installation
5/16" Flat Washer
5/16" x 3" Hex Lag
x4
x4
Insert the hex lags and washers into the Finned anchors.
Tighten all hex lags using a socket wrench and 1/2″ socket.
Do not over tighten the hex lags.
Installation Guide
AM300-B
www.mounts.com | North America 800.368.9700 | Interna1-714-632-7100
Page 7
Drill four (4) pilot holes of each mark using a drill and 3/8”
masonary drill bit. Drill 3 inches deep.
Only use a 3/8" masonary drill bit when drilling pilot holes.
Insert a Finned Anchor into each hole. Lightly tap each Finned
Anchors into place with a hammer.
Finned Anchor
x4
8
9
10
11